COUNTY: DENTON HIGHWAY: FM 2449 LENGTH: 0.3060MI CONTROL NUMBER: 2352-02-027 SBE GOAL: 0.0 % PROJECT NUMBER: C 2352-2-27 TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 108 WORKING DAYSGUARANTY: 28,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 02, 2022*EST.COST: 1,421,532.37 BIDS WILL BE OPENED: 1:00 PM DECEMBER 02, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTRAVIS CAMPBELL ATTN: CONSTRUCTION DIVISION - M1C3.02 2624 W. PRAIRIE STREET 6230 E. STASSNEY LANEDENTON, TX 76201 AUSTIN TX 78744-3147940/323-1809 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: WEST OF FM 156 LIMITS TO: EAST OF FM 156 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 32.1001 104 6017REMOVING CONC (DRIVEWAYS)SY 867.0002 105 6019REMOVING STAB BASE & ASPH PAV(14")SY 715.0003 105 6096REMOV STAB BASE AND ASPH PAV (0"-12")SY 1,128.0004 110 6001EXCAVATION (ROADWAY)CY 1,368.0005 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 3,182.0006 134 6002BACKFILL (TY B)STA 32.1007 161 6017COMPOST MANUF TOPSOIL (4")SY 17,775.0008 162 6002BLOCK SODDINGSY 2,660.0009 164 6039DRILL SEEDING (PERM) (URBAN) (CLAY)SY 15,115.00010 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 8,888.00011 168 6001VEGETATIVE WATERINGMG 3,967.00012 247 6313FL BS (CMP IN PLC)(TY D GR1-2)(12")SY 3,864.00013 260 6002LIME (HYDRATED LIME (SLURRY))TON 64.40014 260 6027LIME TRT (EXST MATL)(8")SY 3,449.00015 314 6021EMULS ASPH (PRIME)(MS-2 OR SS-1)GAL 773.00016 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 450.00017 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 8,888.00018 403 6001TEMPORARY SPL SHORINGSF 302.00019 432 6001RIPRAP (CONC)(4 IN)CY 8.40020 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 60.90021 432 6045RIPRAP (MOW STRIP)(4 IN)CY 56.30022 462 6014CONC BOX CULV (7 FT X 3 FT)LF 90.00023 464 6003RC PIPE (CL III)(18 IN)LF 413.00024 464 6005RC PIPE (CL III)(24 IN)LF 407.00025 464 6007RC PIPE (CL III)(30 IN)LF 143.00026 464 6010RC PIPE (CL III)(48 IN)LF 68.00027 464 6012RC PIPE (CL III)(60 IN)LF 60.00028 466 6007HEADWALL (CH - FW - 0) (DIA= 30 IN)EA 1.00029 466 6105HEADWALL (CH - PW - 0) (DIA= 60 IN)EA 2.00030 466 6180WINGWALL (PW - 1) (HW=5 FT)EA 2.00031 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 16.00032 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 14.00033 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 10.00034 467 6480SET (TY II) (48 IN) (RCP) (6: 1) (P)EA 4.00035 480 6001CLEAN EXIST CULVERTSEA 10.00036 496 6004REMOV STR (SET)EA 48.00037 496 6005REMOV STR (WINGWALL)EA 4.00038 496 6007REMOV STR (PIPE)LF 1,001.00039 500 6001MOBILIZATIONLS 1.00040 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00041 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 165.00042 506 6011ROCK FILTER DAMS (REMOVE)LF 165.00043 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 253.00044 506 6024CONSTRUCTION EXITS (REMOVE)SY 253.00045 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 242.00046 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 242.00047 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 643.00048 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 643.00049 530 6001INTERSECTIONS (CONC)SY 276.00050 530 6002INTERSECTIONS (ACP)SY 371.00051 530 6005DRIVEWAYS (ACP)SY 515.00052 530 6017DRIVEWAYS (CONC) (HES)SY 833.00053 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 4,370.00054 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 2,185.00055 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 330.00056 542 6001REMOVE METAL BEAM GUARD FENCELF 250.00057 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 6.00058 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00059 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 2.00060 636 6001ALUMINUM SIGNS (TY A)SF 28.50061 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 13.00062 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 1.00063 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 2.00064 644 6036IN SM RD SN SUP&AM TYS80(1)SA(U-BM)EA 2.00065 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 16.00066 658 6099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA 7.00067 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 10,580.00068 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 40.00069 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 7,775.00070 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 265.00071 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 6.00072 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 6.00073 666 6093REFL PAV MRK TY I (W)(RR XING)(100MIL)EA 2.00074 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 1,255.00075 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 110.00076 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 10,580.00077 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 7,775.00078 672 6007REFL PAV MRKR TY I-CEA 32.00079 672 6009REFL PAV MRKR TY II-A-AEA 195.00080 685 6005RELOCT RDSD FLSH BCN AM (SOLAR PWRD)EA 2.00081 730 6003SPOT MOWINGAC 3.00082 30776013SP MIXES SP-C SAC-B PG64-22TON 1,466.00083 30776075TACK COATGAL 1,244.00084 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00085 61856002TMA (STATIONARY)DAY 90.00086 61856005TMA (MOBILE OPERATION)DAY 10.00087 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $41,900.00