COUNTY: SHELBY HIGHWAY: FM 1645 LENGTH: 14.2580MI CONTROL NUMBER: 1682-01-015, ETCDBE GOAL: 5.0 % PROJECT NUMBER: STP 1902(029)HES, ETC TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 244 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 04, 2019 EST.COST: 5,798,189.25 BIDS WILL BE OPENED: 1:00 PM JUNE 04, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHARLES "MATT" BRAZI ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 918 INDUSTRIAL BLVD 200 E RIVERSIDENACOGDOCHES, TX 75961 AUSTIN TX 78704-1204936/585-7051 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ SHELBY1682-01-015US 59 FM 1645STP 1902(029)HESSH 87 LENGTH: 7.1310 MILES SHELBY1682-01-014US 59 FM 1645C 1682-1-14SH 87 LENGTH: 7.1270 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 376.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 47.0002 112 6001SUBGRADE WIDENING (ORD COMP)STA 374.4203 132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY 2,885.0004 150 6001BLADINGSTA 374.4205 158 6003SPEC EXCAV WORK (HYD EXCAVATOR)HR 49.0006 164 6009BROADCAST SEED (TEMP) (WARM)SY 39,643.0007 164 6011BROADCAST SEED (TEMP) (COOL)SY 39,643.0008 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 81,911.0009 168 6001VEGETATIVE WATERINGMG 3,237.64010 204 6003SPRINKLING (DUST CONTROL)MG 705.00011 247 6500FL BS (RDWY DEL)(TY D GR 1-2 OR GR 5)TON 27,947.00012 275 6001CEMENTTON 1,269.00013 275 6023CEMENT TREAT(MX EXST MTL & NW BS)(12")SY 70,448.00014 276 6305CEMTRT(PLNTMX)(CLN,TYD,GR1-2ORGR5)(12")SY 8,941.00015 316 6029ASPH (RC-250)GAL 19,848.00016 316 6400ASPH (AC-15P OR AC-10-2TR OR CRS-2P)GAL 83,774.00017 316 6402AGGR (TY-PE, E, L OR PL GR 3)CY 881.00018 316 6417AGGR (TY E OR L GR 5)CY 611.00019 316 6433AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)CY 989.00020 340 6246D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)TON 4,819.00021 340 6270D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIPSY 738.00022 400 6005CEM STABIL BKFLCY 183.00023 403 6001TEMPORARY SPL SHORINGSF 1,800.00024 420 6071CL C CONC (COLLAR)EA 17.00025 432 6003RIPRAP (CONC)(6 IN)CY 3.00026 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 60.00027 462 6062CONC BOX CULV (7 FT X 7 FT)(EXTEND)LF 28.00028 462 6072CONC BOX CULV (9 FT X 9 FT)(EXTEND)LF 26.00029 462 6192CONC BOX CULV (9 FT X 12 FT)(EXTEND)LF 32.00030 464 6003RC PIPE (CL III)(18 IN)LF 2,304.00031 464 6005RC PIPE (CL III)(24 IN)LF 154.00032 464 6007RC PIPE (CL III)(30 IN)LF 12.00033 464 6008RC PIPE (CL III)(36 IN)LF 70.00034 464 6010RC PIPE (CL III)(48 IN)LF 16.00035 465 6126INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)EA 1.00036 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 1.00037 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 1.00038 466 6105HEADWALL (CH - PW - 0) (DIA= 60 IN)EA 1.00039 466 6106HEADWALL (CH - PW - 0) (DIA= 66 IN)EA 1.00040 466 6107HEADWALL (CH - PW - 0) (DIA= 72 IN)EA 1.00041 466 6136HEADWALL (CH - PW - S) (DIA= 48 IN)EA 1.00042 466 6140HEADWALL (CH - PW - S) (DIA= 72 IN)EA 1.00043 466 6185WINGWALL (PW - 2) (HW=10 FT)EA 1.00044 466 6188WINGWALL (PW - 2) (HW=13 FT)EA 1.00045 466 6197WINGWALL (PW - 2) (HW=8 FT)EA 2.00046 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 4.00047 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 136.00048 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 6.00049 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 12.00050 467 6394SET (TY II) (24 IN) (RCP) (6: 1) (C)EA 1.00051 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 3.00052 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 2.00053 467 6448SET (TY II) (36 IN) (RCP) (3: 1) (C)EA 1.00054 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 4.00055 480 6001CLEAN EXIST CULVERTSEA 8.00056 496 6016REMOV STR (PIPE)EA 59.00057 500 6001MOBILIZATIONLS 1.00058 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 26.00059 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,343.00060 506 6011ROCK FILTER DAMS (REMOVE)LF 1,343.00061 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 222.00062 506 6024CONSTRUCTION EXITS (REMOVE)SY 222.00063 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 16,518.00064 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 16,518.00065 530 6004DRIVEWAYS (CONC)SY 43.00066 530 6005DRIVEWAYS (ACP)SY 1,335.00067 530 6006DRIVEWAYS (SURF TREAT)SY 5,284.00068 530 6009TURNOUTS (SURF TREAT)SY 933.00069 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,150.00070 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00071 542 6001REMOVE METAL BEAM GUARD FENCELF 700.00072 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00073 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00074 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00075 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 31.00076 560 6008MAILBOX INSTALL-D (WC-POST) TY 3EA 5.00077 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 12.00078 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.00079 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 101.00080 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 3.00081 644 6076REMOVE SM RD SN SUP&AMEA 117.00082 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 4.00083 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 16.00084 658 6074INSTL DEL ASSN (OM-2Z)(FLX)(WAP)EA 48.00085 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 150,479.00086 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 9,400.00087 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 5,664.00088 666 6224PAVEMENT SEALER 4"LF 543.00089 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 75,239.00090 666 6344REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)LF 3,212.00091 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 58,515.00092 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 66.00093 672 6009REFL PAV MRKR TY II-A-AEA 902.00094 678 6001PAV SURF PREP FOR MRK (4")LF 543.00095 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 897.00096 61856001TMA (STATIONARY)EA 1.00097 61856005TMA (MOBILE OPERATION)DAY 14.00098