COUNTY: HILL HIGHWAY: FM 339 LENGTH: 0MI CONTROL NUMBER: 1662-02-013 DBE GOAL: 6.0 % PROJECT NUMBER: F 2023(278) TYPE: RESTORATION TIME FOR COMPLETION: 165 WORKING DAYSGUARANTY: 53,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 02, 2022*EST.COST: 2,652,025.20 BIDS WILL BE OPENED: 1:00 PM DECEMBER 02, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOSH VOILES ATTN: CONSTRUCTION DIVISION - M1C3.02 1400 S ABBOTT AVE 6230 E. STASSNEY LANEHILLSBORO, TX 76645 AUSTIN TX 78744-3147254/313-8730 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 31 LIMITS TO: LIMESTONE CO LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 70.0001 110 6001EXCAVATION (ROADWAY)CY 5,847.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 5,891.0003 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 40,261.0004 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 40,261.0005 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 40,261.0006 168 6001VEGETATIVE WATERINGMG 655.0007 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 10,066.0008 216 6001PROOF ROLLINGHR 14.0009 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 3,876.00010 247 6135FL BS (RDWY DEL) (TY D GR 3)TON 923.00011 251 6073REWRKING BS MATL (TY C)(10")(ORD COMP)SY 21,694.00012 275 6001CEMENTTON 290.00013 275 6011CEMENT TREAT(EXIST MATL)(8")SY 23,985.00014 305 6011SALV, HAUL & STKPL RCL APH PV (0 TO 6")SY 1,319.00015 314 6006EMULS ASPH (BS OR SUBGR TRT)(MS-2)GAL 13,493.00016 316 6022ASPH (CRS-2)GAL 10,458.00017 316 6397AGGR(TY-D GR-4 OR TY-L GR-4)CY 175.00018 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 1,500.00019 354 6045PLANE ASPH CONC PAV (2")SY 6,878.00020 400 6005CEM STABIL BKFLCY 46.00021 400 6006CUT & RESTORING PAVSY 66.00022 402 6001TRENCH EXCAVATION PROTECTIONLF 37.00023 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 37.00024 462 6003CONC BOX CULV (4 FT X 2 FT)LF 36.00025 462 6020CONC BOX CULV (8 FT X 5 FT)LF 96.00026 3464 6008RC PIPE (CL III)(36 IN)LF 18.00027 465 6002MANH (COMPL)(PRM)(48IN)EA 1.00028 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 2.00029 466 6183WINGWALL (PW - 1) (HW=8 FT)EA 1.00030 466 6184WINGWALL (PW - 1) (HW=9 FT)EA 1.00031 467 6142SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)EA 2.00032 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 1.00033 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 15.00034 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 2.00035 467 6454SET (TY II) (36 IN) (RCP) (6: 1) (P)EA 4.00036 480 6001CLEAN EXIST CULVERTSEA 1.00037 496 6005REMOV STR (WINGWALL)EA 2.00038 496 6006REMOV STR (HEADWALL)EA 4.00039 496 6007REMOV STR (PIPE)LF 263.00040 496 6008REMOV STR (BOX CULVERT)LF 58.00041 500 6001MOBILIZATIONLS 1.00042 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00043 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,075.00044 506 6011ROCK FILTER DAMS (REMOVE)LF 1,075.00045 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,000.00046 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,000.00047 530 6019DRIVEWAYS (ACP)(TYPE 1)SY 880.00048 530 6021DRIVEWAYS (ACP) (TYPE 2)SY 439.00049 530 6024TURNOUTS (RAP)SY 534.00050 530 6027DRIVEWAYS (ACP)(TYPE 3)SY 2,658.00051 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 7,500.00052 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 3,750.00053 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 10.00054 560 6008MAILBOX INSTALL-D (WC-POST) TY 3EA 1.00055 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 28.00056 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 20.00057 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.00058 644 6035IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)EA 1.00059 644 6080RELOCATE SM RD SN SUP & AM TY TEMPEA 51.00060 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 4.00061 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 22,873.00062 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 624.00063 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 22,886.00064 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 887.00065 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 331.00066 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 17,715.00067 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 1,401.00068 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 12,124.00069 672 6009REFL PAV MRKR TY II-A-AEA 224.00070 730 6107FULL - WIDTH MOWINGCYC 2.00071 30776013SP MIXES SP-C SAC-B PG64-22TON 3,234.00072 30856001UNDERSEAL COURSEGAL 7,343.00073 241226010THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)LF 40.00074 141226014THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)LF 432.00075 341226015THERMOPLASTIC PIPE(36")(PP) (TYPE III)LF 64.00076 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00077 61856002TMA (STATIONARY)DAY 100.00078 61856003TMA (MOBILE OPERATION)HR 250.00079 1A464 6003RC PIPE (CL III)(18 IN)LF 432.00080 2A464 6005RC PIPE (CL III)(24 IN)LF 40.00081 3A464 6008RC PIPE (CL III)(36 IN)LF 82.00082 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $20,000.00