COUNTY: WASHINGTON HIGHWAY: FM 2780 LENGTH: 0MI CONTROL NUMBER: 1564-01-036 SBE GOAL: 0.0 % PROJECT NUMBER: C 1564-1-36 TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 293 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 01, 2024*EST.COST: 20,997,386.58 BIDS WILL BE OPENED: 1:00 PM OCTOBER 01, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJAMES KREAMER ATTN: CONSTRUCTION DIVISION - M1C3.02 1821 HIGHWAY 105 6230 E. STASSNEY LANEBRENHAM, TX 77833 AUSTIN TX 78744-3147979/836-9359 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 1697 NORTH LIMITS TO: FM 1697 SOUTH ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 475.6001 105 6002REMOVING STAB BASE AND ASPH PAV (2")SY 126,858.0002 105 6079REMOVING STAB BASE & ASPH PAV (4"-12")SY 8,646.0003 110 6001EXCAVATION (ROADWAY)CY 21,090.0004 110 6002EXCAVATION (CHANNEL)CY 81.0005 132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY 35.0006 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 13,947.0007 134 6011BACKFILLING PAVEMENT EDGESCY 172.0008 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 96,090.0009 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 96,090.00010 164 6009BROADCAST SEED (TEMP) (WARM)SY 48,045.00011 164 6011BROADCAST SEED (TEMP) (COOL)SY 48,045.00012 168 6001VEGETATIVE WATERINGMG 962.00013 247 6230FL BS (CMP IN PLACE)(TY A GR 1-2)(8")SY 173,537.00014 251 6134REWORK BS MTL (TY C) (0"-8")(DENS CONT)SY 35,610.00015 251 6244REWORK BS MTL(TY B)(5"-14")(DENS CONT)SY 85,679.00016 260 6009LIME TRT (EXST MATL)(10")SY 87,210.00017 260 6012LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)TON 1,454.00018 275 6001CEMENTTON 5,529.00019 275 6006CEMENT TREAT (EXIST MATL) (10")SY 173,537.00020 276 6184CEM TRT(PLNT MX) (CL L)(TY D)(GR 4)(6")SY 883.00021 316 6029ASPH (RC-250)GAL 38,370.00022 316 6403AGGR (TY-B GR-5 OR TY-L GR-5)CY 1,129.00023 400 6002STRUCT EXCAV (BOX)CY 254.00024 400 6003STRUCT EXCAV (PIPE)CY 245.00025 400 6005CEM STABIL BKFLCY 1,120.00026 400 6006CUT & RESTORING PAVSY 3,452.00027 402 6001TRENCH EXCAVATION PROTECTIONLF 764.00028 403 6001TEMPORARY SPL SHORINGSF 5,106.00029 416 6003DRILL SHAFT (30 IN)LF 24.00030 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 157.00031 432 6001RIPRAP (CONC)(4 IN)CY 181.00032 432 6002RIPRAP (CONC)(5 IN)CY 23.00033 432 6009RIPRAP (CONC) (CL B) (4")CY 1.05034 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 581.00035 432 6045RIPRAP (MOW STRIP)(4 IN)CY 293.00036 462 6007CONC BOX CULV (5 FT X 3 FT)LF 66.00037 462 6008CONC BOX CULV (5 FT X 4 FT)LF 168.00038 462 6012CONC BOX CULV (6 FT X 5 FT)LF 96.00039 462 6013CONC BOX CULV (6 FT X 6 FT)LF 86.00040 462 6014CONC BOX CULV (7 FT X 3 FT)LF 172.00041 462 6030CONC BOX CULV (10 FT X 6 FT)LF 84.00042 464 6003RC PIPE (CL III)(18 IN)LF 1,092.00043 464 6005RC PIPE (CL III)(24 IN)LF 130.00044 464 6007RC PIPE (CL III)(30 IN)LF 158.00045 464 6008RC PIPE (CL III)(36 IN)LF 178.00046 464 6009RC PIPE (CL III)(42 IN)LF 84.00047 464 6010RC PIPE (CL III)(48 IN)LF 52.00048 464 6018RC PIPE (CL IV)(24 IN)LF 214.00049 464 6025RC PIPE (CL V)(18 IN)LF 1,236.00050 465 6153INLET (COMPL)(PAZD)(RC)(4FTX4FT)EA 1.00051 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 3.00052 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 2.00053 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 3.00054 466 6102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA 2.00055 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 2.00056 466 6156WINGWALL (FW - 0) (HW=9 FT)EA 2.00057 466 6179WINGWALL (PW - 1) (HW=4 FT)EA 3.00058 466 6180WINGWALL (PW - 1) (HW=5 FT)EA 3.00059 466 6181WINGWALL (PW - 1) (HW=6 FT)EA 4.00060 466 6182WINGWALL (PW - 1) (HW=7 FT)EA 3.00061 466 6183WINGWALL (PW - 1) (HW=8 FT)EA 3.00062 466 6184WINGWALL (PW - 1) (HW=9 FT)EA 2.00063 467 6356SET (TY II) (18 IN) (RCP) (3: 1) (C)EA 1.00064 467 6362SET (TY II) (18 IN) (RCP) (6: 1) (C)EA 1.00065 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 110.00066 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 3.00067 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 8.00068 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 4.00069 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 2.00070 496 6004REMOV STR (SET)EA 18.00071 496 6005REMOV STR (WINGWALL)EA 8.00072 496 6006REMOV STR (HEADWALL)EA 13.00073 496 6007REMOV STR (PIPE)LF 2,993.00074 496 6008REMOV STR (BOX CULVERT)LF 24.00075 500 6001MOBILIZATIONLS 1.00076 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 20.00077 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 3,360.00078 506 6011ROCK FILTER DAMS (REMOVE)LF 3,360.00079 506 6034CONSTRUCTION PERIMETER FENCELF 70.00080 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 14,320.00081 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 14,320.00082 530 6002INTERSECTIONS (ACP)SY 748.00083 530 6004DRIVEWAYS (CONC)SY 164.00084 530 6005DRIVEWAYS (ACP)SY 2,065.00085 530 6006DRIVEWAYS (SURF TREAT)SY 7,636.00086 530 6008TURNOUTS (ACP)SY 524.00087 540 6001MTL W-BEAM GD FEN (TIM POST)LF 2,825.00088 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00089 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 30.00090 560 6001MAILBOX INSTALL-S (TWG-POST) TY 1EA 17.00091 560 6002MAILBOX INSTALL-D (TWG-POST) TY 1EA 3.00092 560 6003MAILBOX INSTALL-M (TWG-POST) TY 1EA 2.00093 610 6214IN RD IL (TY SA) 40T-8 (250W EQ) LEDEA 3.00094 618 6023CONDT (PVC) (SCH 40) (2")LF 340.00095 618 6024CONDT (PVC) (SCH 40) (2") (BORE)LF 220.00096 620 6008ELEC CONDR (NO.8) INSULATEDLF 1,680.00097 624 6010GROUND BOX TY D (162922)W/APRONEA 3.00098 628 6145ELC SRV TY D 120/240 060(NS)SS(E)SP(O)EA 1.00099 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 80.000100 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 70.000101 644 6076REMOVE SM RD SN SUP&AMEA 170.000102 658 6101INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRFEA 54.000103 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 9,500.000104 666 6308RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)LF 93,782.000105 666 6317RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)LF 3,941.000106 666 6320RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)LF 70,563.000107 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 325.000108 672 6009REFL PAV MRKR TY II-A-AEA 1,081.000109 752 6005TREE REMOVAL (4" - 12" DIA)EA 10.000110 752 6006TREE REMOVAL (12" - 18" DIA)EA 5.000111 752 6007TREE REMOVAL (18" - 24" DIA)EA 7.000112 752 6008TREE REMOVAL (24" - 30" DIA)EA 1.000113 752 6022TREE TRIMMING AND BRUSH REMOVALLF 500.000114 780 6002CNC CRACK REPAIR (DISCRETE)(INJECT)LF 98.000115 30776012SP MIXES SP-C SAC-A PG64-22TON 26,160.000116 30776075TACK COATGAL 15,855.000117 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.000118 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 9,460.000119 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 9,640.000120 61856002TMA (STATIONARY)DAY 423.000121 61856005TMA (MOBILE OPERATION)DAY 22.000122 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $100,000.00