COUNTY: ORANGE HIGHWAY: FM 1078 LENGTH: 3.2240MI CONTROL NUMBER: 1286-01-018 DBE GOAL: 4.0 % PROJECT NUMBER: STP 2020(784)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 118 WORKING DAYSGUARANTY: 14,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 09, 2020*EST.COST: 705,343.20 BIDS WILL BE OPENED: 1:00 PM APRIL 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONKENNETH WIEMERS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 8450 EASTEX FREEWAY 200 E RIVERSIDEBEAUMONT, TX 77708 AUSTIN TX 78704-1204409/924-6521 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 62, NORTH LIMITS TO: FM 1130 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 156 6001BULLDOZER WORKHR 80.0001 162 6002BLOCK SODDINGSY 8,284.0002 168 6001VEGETATIVE WATERINGMG 70.0003 400 6006CUT & RESTORING PAVSY 208.0004 400 6007CUT & RESTORE CONC PAVINGSY 16.0005 400 6008CUT & RESTORE ASPH PAVINGSY 18.0006 432 6045RIPRAP (MOW STRIP)(4 IN)CY 260.0007 451 6004RETROFIT RAIL (TY T131RC)LF 180.0008 464 6002RC PIPE (CL III)(15 IN)LF 8.0009 464 6003RC PIPE (CL III)(18 IN)LF 515.00010 464 6005RC PIPE (CL III)(24 IN)LF 102.00011 467 6172SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)EA 2.00012 467 6341SET (TY II) (15 IN) (RCP) (6: 1) (P)EA 48.00013 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 72.00014 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 30.00015 496 6006REMOV STR (HEADWALL)EA 2.00016 500 6001MOBILIZATIONLS 1.00017 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00018 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 480.00019 506 6011ROCK FILTER DAMS (REMOVE)LF 480.00020 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 200.00021 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 200.00022 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 17,023.00023 540 6001MTL W-BEAM GD FEN (TIM POST)LF 950.00024 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00025 542 6001REMOVE METAL BEAM GUARD FENCELF 775.00026 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 12.00027 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00028 545 6013CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)EA 4.00029 658 6017INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)EA 24.00030 662 6048WK ZN PAV MRK REMOV (REFL) TY I-CEA 46.00031 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 46.00032 662 6056WK ZN PAV MRK REMOV (TRAF BTN) TY WEA 138.00033 662 6058WK ZN PAV MRK REMOV (TRAF BTN) TY YEA 138.00034 666 6224PAVEMENT SEALER 4"LF 920.00035 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 460.00036 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 9,064.00037 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 20,834.00038 672 6009REFL PAV MRKR TY II-A-AEA 426.00039 677 6001ELIM EXT PAV MRK & MRKS (4")LF 920.00040 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 28.00041 61856002TMA (STATIONARY)DAY 40.00042 61856005TMA (MOBILE OPERATION)DAY 20.00043 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $14,000.00