COUNTY: FAYETTE HIGHWAY: FM 956 LENGTH: 0.1380MI CONTROL NUMBER: 1266-01-008 SBE GOAL: 0.0 % PROJECT NUMBER: C 1266-1-8 TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 16,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 02, 2024*EST.COST: 779,956.20 BIDS WILL BE OPENED: 1:00 PM OCTOBER 02, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOE MORROW IV ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK ST 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147361/293-4399 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT WALKER BRANCH LIMITS TO: STR 1266-01-001 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 7002PREPARING ROWSTA 1.0001 110 7001EXCAV (ROADWAY)CY 856.0002 132 7005EMBANK (FNL)(OC)(TY C)CY 425.0003 150 7002BLADINGHR 20.0004 164 7001BROADCAST SEED (PERM_RURAL_SAND)SY 2,682.0005 164 7005BROADCAST SEED (TEMP_WARM)SY 671.0006 164 7006BROADCAST SEED (TEMP_COOL)SY 671.0007 168 7001VEGETATIVE WATERINGTGL 22.6008 275 7001CEMENTTON 31.0009 275 7017CEMENT TREAT (SUBGRADE) (8")SY 3,222.00010 316 7232AGGR (TY-PE, GR-4)(SAC-B)CY 24.00011 316 7264ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)GAL 1,036.00012 341 7001D-GR HMA TY-B PG64-22TON 1,408.00013 341 7050D-GR HMA TY-D SAC-B PG70-22TON 327.00014 341 7082TACK COATGAL 320.00015 400 7010CEM STABIL BKFLCY 92.00016 402 7001TRENCH EXCAVATION PROTECTIONLF 54.00017 403 7001TEMPORARY SPL SHORINGSF 396.00018 432 7002RIPRAP (CONC)(5 IN)CY 31.70019 432 7043RIPRAP (STONE PROTECTION)(18 IN)CY 100.00020 450 7020RAIL (TY T631)LF 74.54021 462 7037CONC BOX CULV (10 FT X 9 FT)LF 105.60022 466 7166WINGWALL (FW - S) (HW=10 FT)EA 2.00023 496 7001REMOV STR (BOX CULVERT)EA 1.00024 500 7001MOBILIZATIONLS 1.00025 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.00026 503 7002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00027 505 7001TMA (STATIONARY)DAY 4.00028 505 7003TMA (MOBILE OPERATION)DAY 4.00029 506 7001ROCK FILTER DAMS (INSTALL) (TY 1)LF 40.00030 506 7011ROCK FILTER DAMS (REMOVE)LF 40.00031 506 7039TEMP SEDMT CONT FENCE (INSTALL)LF 1,420.00032 506 7041TEMP SEDMT CONT FENCE (REMOVE)LF 1,420.00033 540 7001MTL W-BEAM GD FEN (TIM POST)LF 575.46034 544 7001GUARDRAIL END TREATMENT (INSTALL)EA 4.00035 644 7005IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)EA 1.00036 644 7073REMOVE SM RD SN SUP&AMEA 3.00037 658 7019INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 20.00038 658 7078REMOVE DELIN & OBJECT MARKER ASSMSEA 16.00039 666 7266RE PROFILE PM TY I(W)6"(SLD)(100MIL)LF 1,460.00040 666 7270RE PROFILE PM TY I(Y)6"(SLD)(100MIL)LF 1,460.00041 672 7004REFL PAV MRKR TY II-A-AEA 19.00042 ROAD USER COST 800 7001NO. OF WORKING DAYS$/D 1,775.00043 ** THE NO. OF WORKING DAYS OF 50.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST. * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $2,000.00