COUNTY: BELL HIGHWAY: FM 2670 LENGTH: 3.3590MI CONTROL NUMBER: 1198-03-010 SBE GOAL: 0.0 % PROJECT NUMBER: SSW 1198-3-10 TYPE: SFT TIME FOR COMPLETION: 90 WORKING DAYSGUARANTY: 42,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2019*EST.COST: 2,269,305.61 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSOLOMON THOMAS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 410 W LOOP 121 200 E RIVERSIDEBELTON, TEXAS, TX 76513 AUSTIN TX 78704-1204254/939-3778 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 195 LIMITS TO: END OF STATE MAINTENANCE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 106 6002OBLITERATING ABANDONED ROADSY 432.0001 112 6002SUBGRADE WIDENING (DENS CONT)STA 221.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 5,656.0003 134 6002BACKFILL (TY B)STA 221.0004 162 6008ROLL SODDINGSY 69,066.0005 168 6001VEGETATIVE WATERINGMG 562.0006 316 6022ASPH (CRS-2)GAL 16,757.0007 316 6397AGGR(TY-D GR-4 OR TY-L GR-4)CY 479.0008 341 6008D-GR HMA TY-B PG64-22TON 5,050.0009 341 6022D-GR HMA TY-C PG64-22TON 9,217.00010 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 1,000.00011 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 1,067.00012 356 6021PAV JT UNDERSEAL (24")LF 96.00013 432 6045RIPRAP (MOW STRIP)(4 IN)CY 79.00014 438 6002CLEANING AND SEALING EXIST JOINTS(CL3)LF 96.00015 438 6004CLEANING AND SEALING EXIST JOINTS(CL7)LF 315.00016 438 6006CLEANING AND SEALING JOINTS (CL 3)LF 48.00017 464 6003RC PIPE (CL III)(18 IN)LF 350.00018 464 6005RC PIPE (CL III)(24 IN)LF 70.00019 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 21.00020 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 5.00021 496 6007REMOV STR (PIPE)LF 319.00022 500 6001MOBILIZATIONLS 1.00023 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.00024 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 108.00025 506 6011ROCK FILTER DAMS (REMOVE)LF 108.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 4,425.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 4,425.00028 529 6008CONC CURB & GUTTER (TY II)LF 135.00029 530 6005DRIVEWAYS (ACP)SY 4,004.00030 533 6002RUMBLE STRIPS (CENTERLINE)LF 20,753.00031 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 525.00032 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 12.00033 542 6001REMOVE METAL BEAM GUARD FENCELF 646.00034 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00035 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 12.00036 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 21.00037 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 2.00038 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 2.00039 644 6008IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)EA 2.00040 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 55.00041 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 7.00042 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 17.00043 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 36.00044 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 2,186.00045 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 65.00046 666 6224PAVEMENT SEALER 4"LF 5,228.00047 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 1,136.00048 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 36,618.00049 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 41,797.00050 672 6009REFL PAV MRKR TY II-A-AEA 396.00051 677 6001ELIM EXT PAV MRK & MRKS (4")LF 5,228.00052 730 6107FULL - WIDTH MOWINGCYC 2.00053 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00054 61856002TMA (STATIONARY)DAY 85.00055 61856003TMA (MOBILE OPERATION)HR 90.00056 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $13,000.00