COUNTY: BASTROP HIGHWAY: FM 969 LENGTH: 0MI CONTROL NUMBER: 1186-02-025 DBE GOAL: 5.5 % PROJECT NUMBER: STP 2022(818)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 111 WORKING DAYSGUARANTY: 46,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 04, 2022*EST.COST: 2,292,119.06 BIDS WILL BE OPENED: 1:00 PM AUGUST 04, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDIANA SCHULZE ATTN: CONSTRUCTION DIVISION - M1C3.02 174 SH 21 EAST 6230 E. STASSNEY LANEBASTROP, TX 78602 AUSTIN TX 78744-3147512/308-4468 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.129 MILES WEST OF LAZY RIVER LIMITS TO: 0.264 MILES EAST OF TERRI TRAIL ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 53.1001 104 6009REMOVING CONC (RIPRAP)SY 233.0002 104 6017REMOVING CONC (DRIVEWAYS)SY 180.0003 110 6001EXCAVATION (ROADWAY)CY 4,339.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 3,197.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 18,687.0006 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 18,687.0007 164 6071BROADCAST SEED (TEMP)(WARM OR COOL)SY 18,687.0008 168 6001VEGETATIVE WATERINGMG 31.6009 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 18,687.00010 247 6392FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)CY 2,495.00011 260 6043LIME (HYD, COM OR QK)(SLURRY)TON 231.00012 260 6073LIME TRT (SUBGRADE)(8")SY 12,736.00013 310 6001PRIME COAT (MULTI OPTION)GAL 2,159.00014 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 2,380.00015 351 6019FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")SY 2,400.00016 354 6064PLANE ASPH CONC PAV (2 1/2")SY 809.00017 400 6005CEM STABIL BKFLCY 30.50018 420 6071CL C CONC (COLLAR)EA 2.00019 432 6045RIPRAP (MOW STRIP)(4 IN)CY 16.40020 464 6005RC PIPE (CL III)(24 IN)LF 11.00021 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 1.00022 467 6351SET (TY II) (18 IN) (HDPE) (6: 1) (P)EA 34.00023 467 6384SET (TY II) (24 IN) (HDPE) (6: 1) (P)EA 10.00024 496 6004REMOV STR (SET)EA 1.00025 496 6005REMOV STR (WINGWALL)EA 2.00026 496 6006REMOV STR (HEADWALL)EA 3.00027 496 6007REMOV STR (PIPE)LF 883.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00030 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 90.00031 506 6004ROCK FILTER DAMS (INSTALL) (TY 4)LF 796.00032 506 6011ROCK FILTER DAMS (REMOVE)LF 886.00033 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,565.00034 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,565.00035 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 100.00036 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 100.00037 506 6053ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)LF 36.00038 530 6002INTERSECTIONS (ACP)SY 506.00039 530 6004DRIVEWAYS (CONC)SY 184.00040 530 6005DRIVEWAYS (ACP)SY 1,495.00041 540 6001MTL W-BEAM GD FEN (TIM POST)LF 300.00042 540 6039MTL BM GD FEN TRANS (31"-28")(25')EA 4.00043 542 6001REMOVE METAL BEAM GUARD FENCELF 350.00044 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00045 544 6002GUARDRAIL END TREATMENT (MOVE & RESET)EA 2.00046 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00047 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 8.00048 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 3.00049 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 4.00050 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 32.00051 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 3.00052 644 6076REMOVE SM RD SN SUP&AMEA 26.00053 658 6046INSTL OM ASSM (OM-2X)(WC)GNDEA 6.00054 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 19.00055 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 22,060.00056 662 6075WK ZN PAV MRK REMOV (W)24"(SLD)LF 44.00057 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 22,060.00058 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 100.00059 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 280.00060 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 26.00061 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 12,564.00062 666 6344REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)LF 630.00063 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 9,551.00064 672 6009REFL PAV MRKR TY II-A-AEA 153.00065 677 6001ELIM EXT PAV MRK & MRKS (4")LF 2,000.00066 685 6005RELOCT RDSD FLSH BCN AM (SOLAR PWRD)EA 2.00067 30766003D-GR HMA TY-B PG64-22 (EXEMPT)TON 1,781.00068 30766072D-GR HMA TY-D PG 76-22 (EXEMPT)TON 2,305.00069 30816008TOM-C PG76-22 SAC-BTON 1,347.00070 30846001BONDING COURSEGAL 4,657.00071 41226010THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)LF 230.00072 41226014THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)LF 1,000.00073 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00074 61856002TMA (STATIONARY)DAY 180.00075 61856003TMA (MOBILE OPERATION)HR 160.00076 72516001SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)EA 10.00077 72516002SUBSURFACE UTIL LOCATE (WITHIN RDBED)EA 5.00078 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $40,000.00