COUNTY: VAN ZANDT HIGHWAY: FM 859 LENGTH: 0MI CONTROL NUMBER: 1171-01-022 DBE GOAL: 6.0 % PROJECT NUMBER: STP 2022(813)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 166 WORKING DAYSGUARANTY: 64,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 04, 2022*EST.COST: 3,198,529.51 BIDS WILL BE OPENED: 1:00 PM AUGUST 04, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPRESTON FRIEND ATTN: CONSTRUCTION DIVISION - M1C3.02 205 NE LOOP 564 6230 E. STASSNEY LANEMINEOLA, TX 75773 AUSTIN TX 78744-3147903/569-2349 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 19 LIMITS TO: US 80 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 361.0001 104 6009REMOVING CONC (RIPRAP)SY 13.0002 104 6017REMOVING CONC (DRIVEWAYS)SY 384.0003 112 6001SUBGRADE WIDENING (ORD COMP)STA 12.2404 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 6,864.0005 150 6001BLADINGSTA 361.0006 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 10,753.0007 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 5,377.0008 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 10,753.0009 164 6055BONDED FBR MTRX SEED (TEMP)(WARM)SY 5,377.00010 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 5,377.00011 168 6001VEGETATIVE WATERINGMG 295.70012 314 6012EMULS ASPH (EROSN CONT)(CSS-1)GAL 833.00013 316 6406ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)GAL 2,074.00014 316 6407AGGR (TY-PD GR-3 OR TY-PL GR-3)CY 50.00015 354 6051PLANE ASPH CONC PAV (0" TO 1 1/2")SY 2,132.00016 400 6006CUT & RESTORING PAVSY 86.00017 401 6001FLOWABLE BACKFILLCY 77.00018 403 6001TEMPORARY SPL SHORINGSF 1,970.00019 420 6071CL C CONC (COLLAR)EA 14.00020 420 6077CL E CONC (SEAL SLAB)(NON-REINF)CY 25.00021 432 6001RIPRAP (CONC)(4 IN)CY 3.00022 432 6002RIPRAP (CONC)(5 IN)CY 101.00023 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 396.00024 432 6027RIPRAP (STONE COMMON)(DRY)(24 IN)CY 180.00025 432 6045RIPRAP (MOW STRIP)(4 IN)CY 110.00026 450 6006RAIL (TY T223)LF 222.40027 462 6057CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF 84.00028 462 6061CONC BOX CULV (7 FT X 6 FT)(EXTEND)LF 24.00029 462 6078CONC BOX CULV (10 FT X 10 FT)(EXTEND)LF 43.00030 462 6110CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)LF 12.00031 462 6181CONC BOX CULV (2 FT X 3 FT)(EXTEND)LF 3.00032 462 6183CONC BOX CULV (10 FT X 14 FT)(EXTEND)LF 43.00033 462 6203CONC BOX CULV (3 FT X 1.5 FT)LF 50.00034 1464 6001RC PIPE (CL III)(12 IN)LF 6.00035 1464 6003RC PIPE (CL III)(18 IN)LF 4,342.00036 1464 6005RC PIPE (CL III)(24 IN)LF 336.00037 1464 6007RC PIPE (CL III)(30 IN)LF 158.00038 464 6008RC PIPE (CL III)(36 IN)LF 40.00039 464 6009RC PIPE (CL III)(42 IN)LF 6.00040 464 6010RC PIPE (CL III)(48 IN)LF 96.00041 465 6152INLET (COMPL)(PAZD)(RC)(3FTX3FT)EA 2.00042 465 6153INLET (COMPL)(PAZD)(RC)(4FTX4FT)EA 3.00043 465 6158INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)EA 2.00044 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 2.00045 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 3.00046 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 1.00047 466 6102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA 1.00048 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 4.00049 466 6143WINGWALL (FW - 0) (HW=11 FT)EA 1.00050 466 6147WINGWALL (FW - 0) (HW=15 FT)EA 1.00051 466 6154WINGWALL (FW - 0) (HW=7 FT)EA 2.00052 466 6196WINGWALL (PW - 2) (HW=7 FT)EA 4.00053 467 6091SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)EA 1.00054 467 6356SET (TY II) (18 IN) (RCP) (3: 1) (C)EA 2.00055 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 7.00056 467 6362SET (TY II) (18 IN) (RCP) (6: 1) (C)EA 3.00057 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 262.00058 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 20.00059 467 6394SET (TY II) (24 IN) (RCP) (6: 1) (C)EA 1.00060 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 12.00061 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 1.00062 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 6.00063 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 2.00064 480 6001CLEAN EXIST CULVERTSEA 4.00065 496 6016REMOV STR (PIPE)EA 137.00066 500 6001MOBILIZATIONLS 1.00067 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00068 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 285.00069 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,490.00070 506 6011ROCK FILTER DAMS (REMOVE)LF 1,775.00071 506 6029EARTHWORK (EROSN & SEDMT CONT, IN VEH)CY 300.00072 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 100.00073 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 4,525.00074 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 4,525.00075 506 6046TRACKHOE WORK (EROSION & SEDMT CONT)HR 100.00076 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 3.00077 512 6017PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)LF 860.00078 512 6041PORT CTB (STKPL)(F-SHAPE)(TY 1)LF 860.00079 530 6002INTERSECTIONS (ACP)SY 566.00080 530 6005DRIVEWAYS (ACP)SY 6,542.00081 530 6017DRIVEWAYS (CONC) (HES)SY 384.00082 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 800.00083 540 6022MTL THRIE-BEAM GD FEN (STEEL POST)EA 8.00084 542 6001REMOVE METAL BEAM GUARD FENCELF 474.00085 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00086 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 8.00087 545 6004CRASH CUSH ATTEN (STKPL)EA 2.00088 545 6007CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 2.00089 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 50.00090 658 6099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA 59.00091 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 1,600.00092 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 26.00093 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 200.00094 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 1,600.00095 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 40.00096 662 6113WK ZN PAV MRK SHT TERM RMV (Y)(4")LF 90.00097 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 48.00098 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 260.00099 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 300.000100 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 90.000101 672 6009REFL PAV MRKR TY II-A-AEA 26.000102 30776001SP MIXES SP-B PG64-22TON 719.000103 30776044SP MIXES SP-D PG64-22 (LEVEL-UP)TON 51.000104 30776051SP MIXES SP-D PG70-22TON 419.000105 30776075TACK COATGAL 741.000106 51296001INSTALL FTBLF 200.000107 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 21.000108 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.000109 61856002TMA (STATIONARY)DAY 150.000110 61856005TMA (MOBILE OPERATION)DAY 98.000111 1A464 6003RC PIPE (CL III)(18 IN)LF 88.000112 1A464 6005RC PIPE (CL III)(24 IN)LF 178.000113 1A464 6007RC PIPE (CL III)(30 IN)LF 64.000114 1A41226008THERMOPLASTIC PIPE(30 IN)(PP)(TYPE III)LF 94.000115 1A41226010THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)LF 158.000116 1A41226012THERMOPLASTIC PIPE(12 IN)(PP)(TYPE III)LF 6.000117 1A41226014THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)LF 4,254.000118 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $7,500.00