COUNTY: WILSON HIGHWAY: CR LENGTH: 0.0050MI CONTROL NUMBER: 0915-14-047 DBE GOAL: 4.0 % PROJECT NUMBER: BR 2021(063) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 115 WORKING DAYSGUARANTY: 13,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 02, 2021*EST.COST: 661,914.75 BIDS WILL BE OPENED: 1:00 PM JULY 02, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWILLIAM LOCKETT ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4102 IH 35 SOUTH 200 E RIVERSIDENEW BRAUNFELS, TX 78130 AUSTIN TX 78704-1204830/609-0707 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: CR 347 LIMITS TO: AT CIBOLO CREEK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.4501 100 6007PREP ROW (TREE)(GREATER THAN 24" DIA)EA 1.0002 104 6009REMOVING CONC (RIPRAP)SY 155.0003 105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY 759.0004 110 6001EXCAVATION (ROADWAY)CY 125.0005 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 5.0006 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 146.0007 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 73.0008 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 73.0009 168 6001VEGETATIVE WATERINGMG 4.60010 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 146.00011 216 6001PROOF ROLLINGHR 2.00012 316 6222AGGR(TY-PB GR-3 SAC-B)CY 7.00013 316 6436ASPH (AC-15P OR AC-10-2TR)GAL 211.00014 400 6005CEM STABIL BKFLCY 34.00015 402 6001TRENCH EXCAVATION PROTECTIONLF 102.00016 403 6001TEMPORARY SPL SHORINGSF 820.00017 416 6002DRILL SHAFT (24 IN)LF 183.00018 420 6013CL C CONC (ABUT)CY 18.40019 420 6066CL C CONC (RAIL FOUNDATION)CY 7.50020 422 6007REINF CONC SLAB (SLAB BEAM)SF 1,170.00021 422 6015APPROACH SLABCY 39.00022 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 222.50023 432 6001RIPRAP (CONC)(4 IN)CY 11.20024 432 6045RIPRAP (MOW STRIP)(4 IN)CY 13.50025 450 6006RAIL (TY T223)LF 167.00026 454 6004ARMOR JOINT (SEALED)LF 50.40027 459 6001GABIONS (GALV)CY 232.70028 459 6007GABION MATTRESSES (GALV)(12 IN)SY 111.60029 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00030 500 6001MOBILIZATIONLS 1.00031 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00032 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 225.00033 506 6024CONSTRUCTION EXITS (REMOVE)SY 225.00034 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 137.00035 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 137.00036 540 6001MTL W-BEAM GD FEN (TIM POST)LF 25.00037 540 6014SHORT RADIUSLF 37.50038 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00039 540 6021MTL THRIE-BEAM GD FEN (TIM POST)EA 3.00040 542 6001REMOVE METAL BEAM GUARD FENCELF 189.00041 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00042 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 3.00043 644 6023IN SM RD SN SUP&AM TYFRP(1)UA(P)EA 2.00044 644 6076REMOVE SM RD SN SUP&AMEA 2.00045 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00046 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 8.00047 658 6094INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRFEA 5.00048 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 31.00049 666 6224PAVEMENT SEALER 4"LF 732.00050 666 6228PAVEMENT SEALER 12"LF 31.00051 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 42.00052 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 690.00053 672 6009REFL PAV MRKR TY II-A-AEA 9.00054 678 6001PAV SURF PREP FOR MRK (4")LF 732.00055 678 6006PAV SURF PREP FOR MRK (12")LF 31.00056 30766003D-GR HMA TY-B PG64-22 (EXEMPT)TON 289.00057 30766066TACK COATGAL 14.00058 41716001INSTALL BRIDGE IDENTIFICATION NUMBERSEA 2.00059 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00060 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $2,000.00