COUNTY: BEXAR, ETCHIGHWAY: VA LENGTH: 0.0020MI CONTROL NUMBER: 0915-00-211, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 2019(796)MM TYPE: TRAFFIC CONTROL DEVICES TIME FOR COMPLETION: 120 WORKING DAYSGUARANTY: 9,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2019*EST.COST: 472,836.58 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJESSICA CASTIGLIONE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4615 NW LOOP 410 200 E RIVERSIDESAN ANTONIO, TX 78229 AUSTIN TX 78704-1204210/615-6222 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ BEXAR0915-00-211VARIOUS LOCATIONS IN COMAL AND VASTP 2019(796)MMBEXAR COUNTIES LENGTH: 0.0010 MILES COMAL0915-17-069VARIOUS LOCATIONS IN NEW BRAUNFELS VASTP 2019(796)MM. LENGTH: 0.0010 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6015REMOVING CONC (SIDEWALKS)SY 50.0001 104 6021REMOVING CONC (CURB)LF 125.0002 500 6001MOBILIZATIONLS 1.0003 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.0004 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 50.0005 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 50.0006 529 6002CONC CURB (TY II)LF 125.0007 529 6015CONC CURB (TY C1)LF 125.0008 531 6001CONC SIDEWALKS (4")SY 125.0009 618 6046CONDT (PVC) (SCH 80) (2")LF 125.00010 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 125.00011 618 6048CONDT (PVC) (SCH 80) (2") (BORE)(ROCK)LF 125.00012 618 6050CONDT (PVC) (SCH 80) (2") (ROCK)LF 125.00013 624 6002GROUND BOX TY A (122311)W/APRONEA 6.00014 624 6010GROUND BOX TY D (162922)W/APRONEA 6.00015 690 6036INSTALL OF FND FOR GROUND MNT CABINETSEA 2.00016 690 6038REMOVAL OF CONTROL CABINET(GRND MNT)EA 7.00017 690 6040INSTALL OF CONTROL CABINET(GRND MNT)EA 7.00018 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 89.00019 60046031ITS COM CBL (ETHERNET)LF 10,050.00020 60276003CONDUIT (PREPARE)LF 5,400.00021 60276008GROUND BOX (PREPARE)EA 54.00022 61856002TMA (STATIONARY)DAY 54.00023 63016001INSTALL TRAF SIGNAL CONT EQUIP (PKG 1)EA 101.00024 63016002INSTALL TRAF SIGNAL CONT EQUIP (PKG 2)EA 68.00025 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: MATERIAL FURNISHED BY THE STATE (PART) $1,255,919.25 CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00 MATERIAL FURNISHED BY THE STATE (PART) $77,802.75 MATERIAL FURNISHED BY THE STATE (PART) $77,802.75