COUNTY: BEXAR HIGHWAY: VA LENGTH: 0.0010MI CONTROL NUMBER: 0915-00-206 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2018(899) TYPE: DISTRICTWIDE TRAFFIC CONTROL DEVICE TIME FOR COMPLETION: 120 WORKING DAYSGUARANTY: 9,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 11, 2018*EST.COST: 1,547,528.00 BIDS WILL BE OPENED: 1:00 PM JULY 11, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDALE L. PICHA ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4615 N.W. LOOP 410 200 E RIVERSIDESAN ANTONIO, TX 78229 AUSTIN TX 78704-1204210/615-5810 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: DISTRICTWIDE TRAFFIC CNTRL FY 2018 LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6015REMOVING CONC (SIDEWALKS)SY 25.0001 104 6021REMOVING CONC (CURB)LF 100.0002 500 6001MOBILIZATIONLS 1.0003 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.0004 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 25.0005 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 25.0006 529 6002CONC CURB (TY II)LF 100.0007 529 6015CONC CURB (TY C1)LF 100.0008 531 6001CONC SIDEWALKS (4")SY 100.0009 618 6046CONDT (PVC) (SCH 80) (2")LF 500.00010 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 500.00011 618 6048CONDT (PVC) (SCH 80) (2") (BORE)(ROCK)LF 500.00012 618 6050CONDT (PVC) (SCH 80) (2") (ROCK)LF 500.00013 624 6002GROUND BOX TY A (122311)W/APRONEA 5.00014 624 6010GROUND BOX TY D (162922)W/APRONEA 5.00015 690 6036INSTALL OF FND FOR GROUND MNT CABINETSEA 1.00016 690 6038REMOVAL OF CONTROL CABINET(GRND MNT)EA 5.00017 690 6040INSTALL OF CONTROL CABINET(GRND MNT)EA 5.00018 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 80.00019 60276003CONDUIT (PREPARE)LF 4,500.00020 60276008GROUND BOX (PREPARE)EA 45.00021 61856002TMA (STATIONARY)DAY 45.00022 63016001INSTALL TRAF SIGNAL CONT EQUIP (PKG 1)EA 140.00023 63016002INSTALL TRAF SIGNAL CONT EQUIP (PKG 2)EA 45.00024 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: MATERIAL FURNISHED BY THE STATE (PART) $1,112,775.00 MATERIAL FURNISHED BY THE STATE (PART) $1,112,775.00