COUNTY: FAYETTE HIGHWAY: CR LENGTH: 0.10MI CONTROL NUMBER: 0913-28-070 DBE GOAL: 5.0 % PROJECT NUMBER: BR 2018(330) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 124 WORKING DAYSGUARANTY: 23,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 04, 2022*EST.COST: 1,125,822.80 BIDS WILL BE OPENED: 1:00 PM AUGUST 04, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCLAYTON HARRIS ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK STREET 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147979/533-0478 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT CUMMINS CREEK CR 230 LIMITS TO: (WILLOW SPRINGS RD) STR AA03-98-005 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 4.5001 110 6001EXCAVATION (ROADWAY)CY 15.0002 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 237.0003 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 835.0004 164 6009BROADCAST SEED (TEMP) (WARM)SY 209.0005 164 6011BROADCAST SEED (TEMP) (COOL)SY 209.0006 168 6001VEGETATIVE WATERINGMG 16.2007 247 6366FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)CY 624.0008 316 6029ASPH (RC-250)GAL 107.0009 316 6202AGGR(TY-E GR-5 SAC-B)CY 3.80010 316 6249AGGR(TY-PE GR-4 SAC-B)CY 4.10011 316 6400ASPH (AC-15P OR AC-10-2TR OR CRS-2P)GAL 198.00012 400 6005CEM STABIL BKFLCY 27.00013 403 6001TEMPORARY SPL SHORINGSF 1,384.00014 416 6001DRILL SHAFT (18 IN)LF 70.00015 416 6002DRILL SHAFT (24 IN)LF 406.00016 420 6013CL C CONC (ABUT)CY 22.00017 420 6029CL C CONC (CAP)CY 18.00018 420 6037CL C CONC (COLUMN)CY 8.00019 422 6007REINF CONC SLAB (SLAB BEAM)SF 770.00020 425 6009PRESTR CONC SLAB BEAM (4SB12)LF 189.00021 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 71.00022 434 6002ELASTOMERIC BEARING (LAMINATED)EA 18.00023 446 6002CLEAN & PAINT EXIST STR (SYSTEM II)LS 1.00024 450 6006RAIL (TY T223)LF 143.00025 454 6021TYPE A JOINTLF 100.00026 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00027 496 6043REMOV STR (SMALL FENCE)LF 20.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00030 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 730.00031 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 730.00032 530 6006DRIVEWAYS (SURF TREAT)SY 250.00033 540 6001MTL W-BEAM GD FEN (TIM POST)LF 100.00034 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00035 540 6014SHORT RADIUSLF 50.00036 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00037 552 6001WIRE FENCE (TY A)LF 20.00038 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 3.00039 644 6076REMOVE SM RD SN SUP&AMEA 3.00040 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 3.00041 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 4.00042 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 3.00043 784 6012REP STL BRIDGE MEMBER (TOP CHORD)EA 1.00044 784 6033REP STL BRIDGE MEMBER (TIGHTEN MEMBER)EA 1.00045 784 6034REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)EA 3.00046 784 6038REP STL BRIDGE MEMBER(REPL RIVET/BOLT)EA 100.00047 41026001RELOCATE EXIST TRUSS BRIDGELS 1.00048 42106001SURFACE TREATMENT OF WROUGHT IRONLS 1.00049 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $1,500.00