COUNTY: GALVESTON HIGHWAY: CS LENGTH: 0.0680MI CONTROL NUMBER: 0912-73-212 DBE GOAL: 4.0 % PROJECT NUMBER: BR 1802(833) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 112 WORKING DAYSGUARANTY: 9,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 02, 2021*EST.COST: 429,836.83 BIDS WILL BE OPENED: 1:00 PM JULY 02, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJAMAL ELAHI, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 5407 GULF FREEWAY 200 E RIVERSIDELA MARQUE, TX 77568 AUSTIN TX 78704-1204409/978-2500 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: MCFARLAND RD AT DRAINAGE DITCH LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.6001 110 6001EXCAVATION (ROADWAY)CY 373.0002 110 6002EXCAVATION (CHANNEL)CY 120.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 868.0004 162 6002BLOCK SODDINGSY 1,041.0005 162 6003STRAW OR HAY MULCHSY 1,041.0006 164 6009BROADCAST SEED (TEMP) (WARM)SY 521.0007 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 521.0008 166 6001FERTILIZERAC 0.1009 168 6001VEGETATIVE WATERINGMG 26.00010 340 6011D-GR HMA(SQ) TY-B PG64-22TON 298.00011 340 6272TACK COATGAL 41.00012 400 6005CEM STABIL BKFLCY 27.00013 416 6003DRILL SHAFT (30 IN)LF 252.00014 420 6013CL C CONC (ABUT)CY 25.20015 422 6007REINF CONC SLAB (SLAB BEAM)SF 1,570.00016 422 6015APPROACH SLABCY 39.00017 425 6001PRESTR CONC BOX BEAM (4B20)LF 238.00018 425 6002PRESTR CONC BOX BEAM (5B20)LF 119.00019 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 128.00020 432 6045RIPRAP (MOW STRIP)(4 IN)CY 13.00021 450 6006RAIL (TY T223)LF 152.00022 454 6003ARMOR JOINTLF 44.00023 464 6007RC PIPE (CL III)(30 IN)LF 47.00024 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 1.00025 496 6007REMOV STR (PIPE)LF 44.00026 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00027 500 6001MOBILIZATIONLS 1.00028 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00029 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 60.00030 506 6011ROCK FILTER DAMS (REMOVE)LF 60.00031 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 78.00032 506 6024CONSTRUCTION EXITS (REMOVE)SY 78.00033 506 6034CONSTRUCTION PERIMETER FENCELF 106.00034 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 557.00035 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 557.00036 530 6005DRIVEWAYS (ACP)SY 38.00037 540 6001MTL W-BEAM GD FEN (TIM POST)LF 87.50038 540 6007MTL BEAM GD FEN TRANS (TL2)EA 3.00039 540 6014SHORT RADIUSLF 9.00040 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 1.00041 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00042 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 2.00043 644 6076REMOVE SM RD SN SUP&AMEA 2.00044 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00045 658 6081INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)EA 10.00046 666 6174REFL PAV MRK TY II (W) 6" (SLD)LF 720.00047 666 6210REFL PAV MRK TY II (Y) 6" (SLD)LF 720.00048 672 6009REFL PAV MRKR TY II-A-AEA 9.00049 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 210.00050 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $15,000.00