COUNTY: RUNNELS HIGHWAY: CR LENGTH: 0.0050MI CONTROL NUMBER: 0907-13-012, ETCDBE GOAL: 8.0 % PROJECT NUMBER: BR 1402(117), ETC TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 216 WORKING DAYSGUARANTY: 48,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 04, 2020 EST.COST: 2,414,984.10 BIDS WILL BE OPENED: 1:00 PM JUNE 04, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS HENRY, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2802 ARMSTRONG 200 E RIVERSIDE SAN ANGELO, TX 76903 AUSTIN TX 78704-1204325/486-3801 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ RUNNELS0907-13-012CR 114 OVER PONY CREEK CRBR 1402(117). LENGTH: 0.0010 MILES RUNNELS0907-13-013CR 128 OVER MUSTANG CREEK CRBR 1402(118). LENGTH: 0.0010 MILES RUNNELS0907-13-014CR 301 OVER VALLEY CREEK CRBR 1402(119). LENGTH: 0.0010 MILES RUNNELS0907-13-015CR 272 OVER VALLEY CREEK CRBR 1402(120). LENGTH: 0.0010 MILES RUNNELS0907-13-016CR 216 OVER OAK CREEK CRBR 1402(121). LENGTH: 0.0010 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 20.2401 100 6009PREPARING ROW (TREE) (6" TO 24" DIA)EA 8.0002 110 6001EXCAVATION (ROADWAY)CY 664.0003 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 1,311.0004 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 6,916.0005 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 6,916.0006 164 6009BROADCAST SEED (TEMP) (WARM)SY 3,458.0007 164 6011BROADCAST SEED (TEMP) (COOL)SY 3,458.0008 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 15.0009 216 6001PROOF ROLLINGHR 29.00010 247 6230FL BS (CMP IN PLACE)(TY A GR 1-2)(8")SY 4,134.00011 400 6005CEM STABIL BKFLCY 194.00012 416 6002DRILL SHAFT (24 IN)LF 216.00013 416 6004DRILL SHAFT (36 IN)LF 837.00014 420 6013CL C CONC (ABUT)CY 119.59615 420 6029CL C CONC (CAP)CY 35.80016 420 6037CL C CONC (COLUMN)CY 13.10017 422 6001REINF CONC SLABSF 6,370.00018 422 6007REINF CONC SLAB (SLAB BEAM)SF 3,250.00019 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 617.50020 425 6035PRESTR CONC GIRDER (TX28)LF 969.93021 432 6002RIPRAP (CONC)(5 IN)CY 85.00022 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 35.00023 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 745.00024 450 6006RAIL (TY T223)LF 860.00025 454 6004ARMOR JOINT (SEALED)LF 198.00026 462 6019CONC BOX CULV (8 FT X 4 FT)LF 108.00027 467 6275SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)EA 8.00028 480 6001CLEAN EXIST CULVERTSEA 1.00029 496 6005REMOV STR (WINGWALL)EA 2.00030 496 6008REMOV STR (BOX CULVERT)LF 76.00031 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 4.00032 496 6040REMOV STR (RET WALL)LF 161.00033 500 6001MOBILIZATIONLS 1.00034 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 25.00035 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 319.00036 506 6011ROCK FILTER DAMS (REMOVE)LF 319.00037 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 780.00038 506 6024CONSTRUCTION EXITS (REMOVE)SY 780.00039 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 3,505.00040 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 3,505.00041 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 300.00042 540 6007MTL BEAM GD FEN TRANS (TL2)EA 8.00043 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 8.00044 540 6018MTL BM GD FEN TRANS (NON - SYM)EA 8.00045 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00046 552 6003WIRE FENCE (TY C)LF 1,540.00047 644 6076REMOVE SM RD SN SUP&AMEA 17.00048 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 32.00049 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 20.00050 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 32.00051