COUNTY: POTTER HIGHWAY: VA LENGTH: 0MI CONTROL NUMBER: 0904-00-194 SBE GOAL: 0.0 % PROJECT NUMBER: C 904-00-194 TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 260 WORKING DAYSGUARANTY: 59,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 04, 2020*EST.COST: 2,959,757.50 BIDS WILL BE OPENED: 1:00 PM JUNE 04, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTIFFANY PULLIAM ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 PO BOX 7368 200 E RIVERSIDEAMARILLO, TX 79114 AUSTIN TX 78704-1204806/356-3270 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: VARIOUS LOCATIONS DISTRICT WIDE LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 416 6027DRILL SHAFT (HIGH MAST POLE) (66 IN)LF 135.0001 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 1,152.0002 432 6001RIPRAP (CONC)(4 IN)CY 8.0003 432 6002RIPRAP (CONC)(5 IN)CY 24.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 15.0006 514 6038PERM CTB (SSCB)(TY 1)(MOD)LF 1,521.0007 514 6047PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)LF 56.0008 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 100.0009 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00010 542 6001REMOVE METAL BEAM GUARD FENCELF 1,570.00011 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00012 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00013 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00014 610 6102REPLACE LUMINAIRE W/LED (250W EQ)EA 165.00015 610 6103REPLACE LUMINAIRE W/LED (400W EQ)EA 8.00016 610 6254IN RD IL (TY ST) 40T-8 (250W EQ) LEDEA 114.00017 610 6323IN RD IL (TY ST) 50T-12-12(400W EQ)LEDEA 30.00018 613 6008HI MST IL POLE (175 FT)(100 MPH)EA 3.00019 618 6023CONDT (PVC) (SCH 40) (2")LF 31,830.00020 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 2,685.00021 620 6004ELEC CONDR (NO.12) INSULATEDLF 1,100.00022 620 6007ELEC CONDR (NO.8) BARELF 41,890.00023 620 6008ELEC CONDR (NO.8) INSULATEDLF 83,780.00024 624 6002GROUND BOX TY A (122311)W/APRONEA 76.00025 624 6008GROUND BOX TY C (162911)W/APRONEA 12.00026 628 6047ELC SRV TY A 240/480 060(NS)SS(E)TP(O)EA 5.00027 628 6078ELC SRV TY A 240/480 100(NS)SS(E)TP(O)EA 2.00028 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 25.00029 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 12.00030 61566001LED HI MST IL ASM (6 FIXT)(SYM)(TY S)EA 1.00031 61566003LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)EA 2.00032 61566007REPLC LED HI MST IL(6 FIXT)(ASYM)(TY B)EA 9.00033 61856002TMA (STATIONARY)DAY 270.00034 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00