COUNTY: COLLIN HIGHWAY: FM 2862 LENGTH: 4.6440MI CONTROL NUMBER: 0816-05-025 DBE GOAL: 5.5 % PROJECT NUMBER: STP 2023(916)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 230 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 02, 2023*EST.COST: 5,851,893.91 BIDS WILL BE OPENED: 1:00 PM JUNE 02, 2023 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJENNIFER VORSTER ATTN: CONSTRUCTION DIVISION - M1C3.02 2205 SOUTH SH 5 6230 E. STASSNEY LANEMCKINNEY, TX 75069 AUSTIN TX 78744-3147972/547-2231 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 5 LIMITS TO: WESTOVER LANE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 240.0501 104 6015REMOVING CONC (SIDEWALKS)SY 22.0002 104 6017REMOVING CONC (DRIVEWAYS)SY 749.0003 110 6001EXCAVATION (ROADWAY)CY 4,451.0004 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 9,369.0005 134 6004BACKFILL (TY A OR B)STA 240.0506 150 6001BLADINGSTA 240.0507 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 149,554.0008 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 149,554.0009 168 6001VEGETATIVE WATERINGMG 44,495.00010 351 6006FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")SY 803.00011 354 6045PLANE ASPH CONC PAV (2")SY 67,013.00012 400 6005CEM STABIL BKFLCY 366.00013 400 6006CUT & RESTORING PAVSY 323.00014 401 6001FLOWABLE BACKFILLCY 4.00015 402 6001TRENCH EXCAVATION PROTECTIONLF 154.00016 432 6003RIPRAP (CONC)(6 IN)CY 1.00017 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 158.00018 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 592.00019 432 6045RIPRAP (MOW STRIP)(4 IN)CY 51.00020 462 6021CONC BOX CULV (8 FT X 6 FT)LF 58.00021 464 6003RC PIPE (CL III)(18 IN)LF 1,846.00022 464 6005RC PIPE (CL III)(24 IN)LF 658.00023 464 6007RC PIPE (CL III)(30 IN)LF 195.00024 464 6008RC PIPE (CL III)(36 IN)LF 67.00025 464 6009RC PIPE (CL III)(42 IN)LF 108.00026 464 6010RC PIPE (CL III)(48 IN)LF 9.00027 464 6018RC PIPE (CL IV)(24 IN)LF 205.00028 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 4.00029 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 4.00030 466 6102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA 2.00031 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 2.00032 466 6172WINGWALL (PW - 1) (HW=11 FT)EA 1.00033 466 6173WINGWALL (PW - 1) (HW=12 FT)EA 1.00034 467 6359SET (TY II) (18 IN) (RCP) (4: 1) (P)EA 4.00035 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 116.00036 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 14.00037 467 6391SET (TY II) (24 IN) (RCP) (4: 1) (P)EA 2.00038 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 30.00039 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 8.00040 496 6004REMOV STR (SET)EA 20.00041 496 6007REMOV STR (PIPE)LF 2,611.00042 500 6001MOBILIZATIONLS 1.00043 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00044 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,670.00045 506 6011ROCK FILTER DAMS (REMOVE)LF 1,670.00046 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 172.00047 506 6024CONSTRUCTION EXITS (REMOVE)SY 172.00048 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 22,370.00049 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 22,370.00050 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 1,584.00051 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,584.00052 530 6004DRIVEWAYS (CONC)SY 919.00053 530 6005DRIVEWAYS (ACP)SY 5,895.00054 533 6001RUMBLE STRIPS (SHOULDER)LF 37,009.00055 533 6002RUMBLE STRIPS (CENTERLINE)LF 18,183.00056 540 6001MTL W-BEAM GD FEN (TIM POST)LF 312.50057 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00058 542 6001REMOVE METAL BEAM GUARD FENCELF 180.00059 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00060 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 6.00061 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 5.00062 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 38.00063 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 2.00064 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 3.00065 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 123.00066 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 2.00067 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 1.00068 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 2.00069 644 6036IN SM RD SN SUP&AM TYS80(1)SA(U-BM)EA 1.00070 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 17.00071 658 6099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA 28.00072 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 1,181.00073 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 41,955.00074 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 2,454.00075 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 96.00076 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 44.00077 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 268.00078 666 6196REFL PAV MRK TY II (W) (RR XING)EA 2.00079 666 6225PAVEMENT SEALER 6"LF 2,056.00080 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 47,967.00081 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 1,181.00082 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 41,955.00083 672 6009REFL PAV MRKR TY II-A-AEA 589.00084 678 6002PAV SURF PREP FOR MRK (6")LF 2,056.00085 685 6005RELOCT RDSD FLSH BCN AM (SOLAR PWRD)EA 2.00086 30776001SP MIXES SP-B PG64-22TON 10,566.00087 30776013SP MIXES SP-C SAC-B PG64-22TON 9,551.00088 30776075TACK COATGAL 8,897.00089 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00090 61856002TMA (STATIONARY)DAY 200.00091 61856003TMA (MOBILE OPERATION)HR 200.00092 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $300,445.41