COUNTY: BAYLOR HIGHWAY: FM 422 LENGTH: 5.9820MI CONTROL NUMBER: 0814-01-036 DBE GOAL: 0.0 % PROJECT NUMBER: F 2B24(123) TYPE: RESTORATION TIME FOR COMPLETION: 311 WORKING DAYSGUARANTY: 83,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2024*EST.COST: 4,164,280.81 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONZACHARY HUSEN ATTN: CONSTRUCTION DIVISION - RM M1C3.02 848 US 380 WEST 6230 E. STASSNEY LANEGRAHAM, TX 76450 AUSTIN TX 78744-3147940/549-0676 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: STADIUM DRIVE LIMITS TO: FM 1790 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 272.0001 110 6001EXCAVATION (ROADWAY)CY 2,246.0002 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 3,223.0003 134 6002BACKFILL (TY B)STA 307.0004 164 6009BROADCAST SEED (TEMP) (WARM)SY 16,997.0005 164 6011BROADCAST SEED (TEMP) (COOL)SY 16,997.0006 164 6033DRILL SEEDING (PERM) (RURAL) (SANDY)SY 33,994.0007 168 6001VEGETATIVE WATERINGMG 294.0008 275 6001CEMENTTON 523.0009 275 6010CEMENT TREAT (SUBGRADE) (8")SY 30,592.00010 310 6009PRIME COAT (MC-30)GAL 7,649.00011 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 8,515.00012 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 2,500.00013 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 1,511.00014 400 6005CEM STABIL BKFLCY 85.00015 400 6006CUT & RESTORING PAVSY 175.00016 402 6001TRENCH EXCAVATION PROTECTIONLF 27.00017 403 6001TEMPORARY SPL SHORINGSF 124.00018 462 6051CONC BOX CULV (5 FT X 3 FT)(EXTEND)LF 114.00019 464 6005RC PIPE (CL III)(24 IN)LF 268.00020 464 6007RC PIPE (CL III)(30 IN)LF 234.00021 464 6008RC PIPE (CL III)(36 IN)LF 46.00022 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 2.00023 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 4.00024 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 2.00025 466 6193WINGWALL (PW - 2) (HW=4 FT)EA 3.00026 466 6194WINGWALL (PW - 2) (HW=5 FT)EA 1.00027 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 34.00028 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 11.00029 467 6394SET (TY II) (24 IN) (RCP) (6: 1) (C)EA 2.00030 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 8.00031 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 2.00032 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 2.00033 496 6005REMOV STR (WINGWALL)EA 4.00034 496 6007REMOV STR (PIPE)LF 1,025.00035 500 6001MOBILIZATIONLS 1.00036 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 19.00037 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 975.00038 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 975.00039 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 560.00040 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 560.00041 530 6004DRIVEWAYS (CONC)SY 272.00042 530 6005DRIVEWAYS (ACP)SY 1,095.00043 530 6008TURNOUTS (ACP)SY 308.00044 530 6016 DRIVEWAYS (BASE)SY 2,089.00045 533 6001RUMBLE STRIPS (SHOULDER)LF 63,940.00046 533 6002RUMBLE STRIPS (CENTERLINE)LF 31,970.00047 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 1.00048 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 13.00049 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 16.00050 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 2.00051 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 1.00052 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 16.00053 644 6076REMOVE SM RD SN SUP&AMEA 35.00054 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 36.00055 658 6100INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)EA 36.00056 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 4,569.00057 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 63,600.00058 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 34,600.00059 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 11,565.00060 30766001D-GR HMA TY-B PG64-22TON 6,731.00061 30766038D-GR HMA TY-D PG64-22 (LEVEL-UP)TON 783.00062 30766046D-GR HMA TY-D SAC-B PG70-28TON 11,090.00063 30846001BONDING COURSEGAL 7,882.00064 41226023THERMO PIPE(18")(PP)(TY S)(TY II)LF 534.00065 41226024THERMO PIPE(24")(PP)(TY S)(TY II)LF 154.00066 61856002TMA (STATIONARY)DAY 283.00067 61856005TMA (MOBILE OPERATION)DAY 8.00068 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $4,000.00 Total Bid Amount _______________________________ ____________________________________ certifies that the unit prices shown on this completed computer print-out for all of the bid items, alternate items, option items, and add alternate items contained in this proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other information from this print-out. ____________________________________ acknowledges and agrees that the total bid amount shown will be read as its total bid and further agree that the official total bid amount will be determined by multiplying the unit bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then totaling all of the extended amounts. Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________ Additional Signature for Joint Venture: Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________