COUNTY: WICHITA HIGHWAY: FM 369 LENGTH: 0.20MI CONTROL NUMBER: 0802-02-053 DBE GOAL: 5.5 % PROJECT NUMBER: NH 2017(606) TYPE: MISCELLANEOUS WORK TIME FOR COMPLETION: 155 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2018*EST.COST: 5,723,640.00 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID M. ROHMER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2844 CENTRAL FWY E 200 E RIVERSIDEWICHITA FALLS, TX 76301 AUSTIN TX 78704-1204940/397-2076 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: NEAR MCNIEL AVE LIMITS TO: NEAR RHEA RD ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 2,929.0001 104 6022REMOVING CONC (CURB AND GUTTER)LF 2,585.0002 104 6024REMOVING CONC (RETAINING WALLS)SY 57.0003 104 6028REMOVING CONC (MISC)SY 4.0004 104 6031REMOVING CONC (HEADWALL)CY 9.0005 105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY 2,190.0006 216 6001PROOF ROLLINGHR 21.0007 275 6001CEMENTTON 16.0008 275 6019CEMENT TREAT (SUBGRADE)(6")SY 1,982.0009 310 6005PRIME COAT (AE-P)GAL 485.00010 340 6239D-GR HMA(SQ) TY-B SAC-B PG64-22TON 1,011.00011 346 6026STONE-MTRX-ASPH SMA-F SAC-A PG76-22TON 195.00012 354 6045PLANE ASPH CONC PAV (2")SY 354.00013 400 6005CEM STABIL BKFLCY 2,091.00014 403 6001TEMPORARY SPL SHORINGSF 9,996.00015 420 6051CL C CONC (CULV)CY 72.90016 420 6071CL C CONC (COLLAR)EA 2.00017 420 6143CL S CONC (JUNCTION BOX)CY 277.60018 432 6001RIPRAP (CONC)(4 IN)CY 358.00019 462 6019CONC BOX CULV (8 FT X 4 FT)LF 177.00020 462 6101CONC BOX CULV (10 FT X 4 FT)LF 1,185.00021 462 6167CONC BOX CULV (12 FT X 3 FT)LF 1,068.00022 464 6005RC PIPE (CL III)(24 IN)LF 4.00023 465 6168INLET (COMPL)(TY A)EA 4.00024 465 6176INLET (COMPL)(CURB)(TY C1)EA 3.00025 496 6002REMOV STR (INLET)EA 1.00026 496 6007REMOV STR (PIPE)LF 8.00027 496 6008REMOV STR (BOX CULVERT)LF 248.00028 496 6056REMOVE STR (STL SECTIONS)LF 225.00029 496 6068REMOV STR (WINGWALL PARAPET)EA 2.00030 500 6001MOBILIZATIONLS 1.00031 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 9.00032 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 28.00033 506 6011ROCK FILTER DAMS (REMOVE)LF 28.00034 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 78.00035 506 6024CONSTRUCTION EXITS (REMOVE)SY 78.00036 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 100.00037 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 800.00038 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 800.00039 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 60.00040 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 60.00041 508 6001CONSTRUCTING DETOURSSY 1,026.00042 512 6021PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF 2,120.00043 512 6022PORT CTB (DES SOURCE)(LOW PROF)(TY 2)LF 40.00044 512 6045PORT CTB (STKPL)(LOW PROF)(TY 1)LF 2,120.00045 512 6046PORT CTB (STKPL)(LOW PROF)(TY 2)LF 40.00046 529 6008CONC CURB & GUTTER (TY II)LF 2,585.00047 542 6001REMOVE METAL BEAM GUARD FENCELF 700.00048 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 1.00049 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00050 662 6060WK ZN PAV MRK REMOV (W)4"(BRK)LF 500.00051 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 2,015.00052 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 2,955.00053 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 240.00054 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 50.00055 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 1,360.00056 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 2,450.00057 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,550.00058 672 6010REFL PAV MRKR TY II-C-REA 80.00059 677 6001ELIM EXT PAV MRK & MRKS (4")LF 1,200.00060 61856001TMA (STATIONARY)EA 4.00061 61856005 TMA (MOBILE OPERATION)DAY 5.00062 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00