COUNTY: KAUFMAN HIGHWAY: FM 148 LENGTH: 4.7460MI CONTROL NUMBER: 0751-03-043 DBE GOAL: 8.5 % PROJECT NUMBER: F 2024(168) TYPE: RESTORATION TIME FOR COMPLETION: 294 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 04, 2024*EST.COST: 10,945,982.68 BIDS WILL BE OPENED: 1:00 PM APRIL 04, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONLANE SELMAN, P.E. ATTN: CONSTRUCTION DIVISION - M1C3.02 2750 S WASHINGTON 6230 E. STASSNEY LANEKAUFMAN, TX 75142 AUSTIN TX 78744-3147972/962-3617 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 2613 LIMITS TO: SH 274 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 250.6401 104 6017REMOVING CONC (DRIVEWAYS)SY 51.0002 105 6043REMOVING STAB BASE & ASPH PAV (0-6")SY 6,221.0003 105 6137REMOVE TRT BASE & ASPH PAV (12"-20")SY 14,956.0004 110 6001EXCAVATION (ROADWAY)CY 936.3005 112 6001SUBGRADE WIDENING (ORD COMP)STA 188.3306 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 5,376.7507 134 6004BACKFILL (TY A OR B)STA 249.4208 152 6001ROAD GRADER WORK (ORD COMP)STA 249.4209 161 6017COMPOST MANUF TOPSOIL (4")SY 144,802.00010 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 144,802.00011 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 144,802.00012 168 6001VEGETATIVE WATERINGMG 43,085.00013 247 6073FL BS (CMP IN PLC)(TY D GR 1-2) (6")SY 18,691.00014 247 6313FL BS (CMP IN PLC)(TY D GR1-2)(12")SY 76,039.00015 251 6073REWRKING BS MATL (TY C)(10")(ORD COMP)SY 50,220.00016 275 6001CEMENTTON 479.00017 275 6002CEMENT TREAT (EXIST MATL) (6")SY 62,775.00018 275 6003CEMENT TREAT (NEW BASE) (6")SY 18,691.00019 314 6021EMULS ASPH (PRIME)(MS-2 OR SS-1)GAL 15,213.00020 316 6024ASPH (CRS-2P)GAL 37,548.00021 316 6419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL 15,972.00022 316 6435AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)CY 356.00023 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 727.00024 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 197.00025 354 6045PLANE ASPH CONC PAV (2")SY 1,958.00026 400 6008CUT & RESTORE ASPH PAVINGSY 72.00027 402 6001TRENCH EXCAVATION PROTECTIONLF 128.00028 403 6001TEMPORARY SPL SHORINGSF 4,754.00029 432 6002RIPRAP (CONC)(5 IN)CY 29.60030 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 367.00031 462 6045CONC BOX CULV (3 FT X 2 FT)(EXTEND)LF 19.00032 462 6046CONC BOX CULV (3 FT X 3 FT)(EXTEND)LF 14.00033 462 6048CONC BOX CULV (4 FT X 3 FT)(EXTEND)LF 16.00034 462 6049CONC BOX CULV (4 FT X 4 FT)(EXTEND)LF 18.00035 462 6050CONC BOX CULV (5 FT X 2 FT)(EXTEND)LF 14.00036 462 6051CONC BOX CULV (5 FT X 3 FT)(EXTEND)LF 40.00037 462 6054CONC BOX CULV (6 FT X 3 FT)(EXTEND)LF 30.00038 462 6056CONC BOX CULV (6 FT X 5 FT)(EXTEND)LF 45.00039 462 6057CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF 28.00040 462 6095CONC BOX CULV (6 FT X 2 FT) (EXTEND)LF 14.00041 464 6003RC PIPE (CL III)(18 IN)LF 1,466.00042 464 6005RC PIPE (CL III)(24 IN)LF 308.00043 464 6008RC PIPE (CL III)(36 IN)LF 38.00044 464 6018RC PIPE (CL IV)(24 IN)LF 116.00045 464 6019RC PIPE (CL IV)(30 IN)LF 98.00046 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 2.00047 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 2.00048 466 6192WINGWALL (PW - 2) (HW=3 FT)EA 2.00049 466 6193WINGWALL (PW - 2) (HW=4 FT)EA 4.00050 466 6194WINGWALL (PW - 2) (HW=5 FT)EA 2.00051 466 6195WINGWALL (PW - 2) (HW=6 FT)EA 2.00052 466 6196WINGWALL (PW - 2) (HW=7 FT)EA 2.00053 467 6111SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)EA 2.00054 467 6144SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)EA 2.00055 467 6171SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)EA 2.00056 467 6204SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)EA 2.00057 467 6211SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)EA 2.00058 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 117.00059 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 4.00060 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 28.00061 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 2.00062 467 6454SET (TY II) (36 IN) (RCP) (6: 1) (P)EA 2.00063 480 6001CLEAN EXIST CULVERTSEA 12.00064 496 6004REMOV STR (SET)EA 72.00065 496 6005REMOV STR (WINGWALL)EA 22.00066 496 6007REMOV STR (PIPE)LF 175.80067 496 6016REMOV STR (PIPE)EA 60.00068 500 6001MOBILIZATIONLS 1.00069 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 18.00070 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 1,170.00071 506 6011ROCK FILTER DAMS (REMOVE)LF 1,170.00072 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 328.00073 506 6024CONSTRUCTION EXITS (REMOVE)SY 328.00074 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,042.00075 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,042.00076 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 2,111.00077 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 2,111.00078 530 6005DRIVEWAYS (ACP)SY 5,791.00079 530 6017DRIVEWAYS (CONC) (HES)SY 52.00080 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 49,535.00081 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 25,062.00082 542 6001REMOVE METAL BEAM GUARD FENCELF 375.00083 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00084 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 40.00085 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 6.00086 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 3.00087 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 52.00088 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 1.00089 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 4.00090 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 1.00091 644 6036IN SM RD SN SUP&AM TYS80(1)SA(U-BM)EA 5.00092 658 6100INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)EA 44.00093 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 3,133.00094 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 140.00095 666 6174REFL PAV MRK TY II (W) 6" (SLD)LF 126,185.00096 666 6208REFL PAV MRK TY II (Y) 6" (BRK)LF 7,025.00097 666 6210REFL PAV MRK TY II (Y) 6" (SLD)LF 73,443.00098 666 6225PAVEMENT SEALER 6"LF 366.00099 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 49,535.000100 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 2,789.000101 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 29,338.000102 672 6009REFL PAV MRKR TY II-A-AEA 562.000103 678 6002PAV SURF PREP FOR MRK (6")LF 366.000104 730 6107FULL - WIDTH MOWINGCYC 3.000105 30776013SP MIXES SP-C SAC-B PG64-22TON 8,588.000106 30776075TACK COATGAL 4,788.000107 50016002GEOGRID BASE REINFORCEMENT (TY II)SY 40,097.000108 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 3.000109 61856002TMA (STATIONARY)DAY 294.000110 61856005TMA (MOBILE OPERATION)DAY 20.000111 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $86,025.42