COUNTY: KAUFMAN HIGHWAY: FM 148 LENGTH: 0.23MI CONTROL NUMBER: 0751-02-025 DBE GOAL: 5.0 % PROJECT NUMBER: BR 1802(375) TYPE: REPLACE BRIDGE AND APPROACHES TIME FOR COMPLETION: 375 WORKING DAYSGUARANTY: 54,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 11, 2018*EST.COST: 3,314,751.51 BIDS WILL BE OPENED: 1:00 PM JULY 11, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJEFFREY BUSH ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2750 S WASHINGTON 200 E RIVERSIDEKAUFMAN, TX 75142 AUSTIN TX 78704-1204972/962-3617 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT BUFFALO CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 12.2001 104 6009REMOVING CONC (RIPRAP)SY 145.0002 105 6020REMOVING STAB BASE & ASPH PAV (12")SY 2,770.0003 110 6001EXCAVATION (ROADWAY)CY 1,760.0004 132 6025EMBANKMENT (FINAL) (DENS CONT) (TY C1)CY 5,864.0005 132 6026EMBANKMENT (FINAL) (DENS CONT) (TY C2)CY 523.0006 161 6017COMPOST MANUF TOPSOIL (4")SY 12,666.0007 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 12,666.0008 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 12,666.0009 168 6001VEGETATIVE WATERINGMG 1,138.00010 247 6312FL BS (CMP IN PLC)(TY D GR1-2)(8")SY 4,334.00011 260 6002LIME (HYDRATED LIME (SLURRY))TON 99.00012 260 6011LIME TRT (EXST MATL) (12")SY 4,334.00013 310 6029PRIME COAT (MS-2 OR SS-1)GAL 867.00014 316 6024ASPH (CRS-2P)GAL 1,085.00015 316 6419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL 912.00016 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 42.00017 344 6104SUPERPAVE MIXTURES SP-D SAC-B PG64-22TON 932.00018 400 6005CEM STABIL BKFLCY 69.00019 402 6001TRENCH EXCAVATION PROTECTIONLF 69.00020 403 6001TEMPORARY SPL SHORINGSF 2,780.70021 403 6006TEMPORARY SPL SHORING (COFFERDAM)SF 600.00022 416 6004DRILL SHAFT (36 IN)LF 925.00023 420 6014CL C CONC (ABUT)(HPC)CY 51.30024 420 6030CL C CONC (CAP)(HPC)CY 69.90025 420 6038CL C CONC (COLUMN)(HPC)CY 22.10026 422 6002REINF CONC SLAB (HPC)SF 9,634.00027 422 6016APPROACH SLAB (HPC)CY 267.00028 425 6020PRESTR CONC BOX BEAM (5XB20)LF 1,193.01029 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 658.00030 432 6045RIPRAP (MOW STRIP)(4 IN)CY 85.00031 450 6007RAIL (TY T223)(HPC)LF 441.40032 454 6001SEALED EXPANSION JOINT (4 IN) (SEJ - A)LF 95.00033 462 6013CONC BOX CULV (6 FT X 6 FT)LF 344.00034 462 6057CONC BOX CULV (6 FT X 6 FT)(EXTEND)LF 75.00035 466 6197WINGWALL (PW - 2) (HW=8 FT)EA 4.00036 480 6001CLEAN EXIST CULVERTSEA 1.00037 496 6005REMOV STR (WINGWALL)EA 4.00038 496 6008REMOV STR (BOX CULVERT)LF 236.00039 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 2.00040 500 6001MOBILIZATIONLS 1.00041 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 18.00042 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 240.00043 506 6011ROCK FILTER DAMS (REMOVE)LF 240.00044 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 528.00045 506 6024CONSTRUCTION EXITS (REMOVE)SY 528.00046 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 3,745.00047 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 3,745.00048 508 6001CONSTRUCTING DETOURSSY 4,150.00049 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 2,430.00050 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 3,600.00051 512 6053PORT CTB (REMOVE)(F-SHAPE)(TY 1)LF 2,430.00052 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,950.00053 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00054 542 6001REMOVE METAL BEAM GUARD FENCELF 1,876.00055 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00056 544 6004GDRAIL END TRT(INST)(WOOD POST)(TY I)EA 4.00057 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 6.00058 545 6005CRASH CUSH ATTEN (REMOVE)EA 4.00059 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 4.00060 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 2.00061 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00062 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 8.00063 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 8.00064 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 27.00065 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 2,488.00066 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 2,312.00067 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 382.00068 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 7,181.00069 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 5,312.00070 666 6224PAVEMENT SEALER 4"LF 800.00071 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 2,424.00072 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,424.00073 666 6323RE PM W/RET REQ TY II (W) 4" (SLD)LF 400.00074 666 6327RE PM W/RET REQ TY II (Y) 4" (SLD)LF 400.00075 672 6009REFL PAV MRKR TY II-A-AEA 30.00076 677 6001ELIM EXT PAV MRK & MRKS (4")LF 2,924.00077 678 6001PAV SURF PREP FOR MRK (4")LF 4,848.00078 730 6107FULL - WIDTH MOWINGCYC 3.00079 734 6002LITTER REMOVALCYC 3.00080 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00081 61856001TMA (STATIONARY)EA 2.00082 61856003TMA (MOBILE OPERATION)HR 162.00083 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $163,000.00