COUNTY: TYLER HIGHWAY: FM 92 LENGTH: 0MI CONTROL NUMBER: 0703-01-067 DBE GOAL: 2.0 % PROJECT NUMBER: STP 2020(783) TYPE: OVERLAY TIME FOR COMPLETION: 180 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 09, 2020*EST.COST: 8,195,290.48 BIDS WILL BE OPENED: 1:00 PM APRIL 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONVADA BYFORD, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3304 US HWY 190 W 200 E RIVERSIDEJASPER, TX 75951 AUSTIN TX 78704-1204409/224-7295 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: HARDIN COUNTY LINE, NORTH LIMITS TO: 2 MILES SOUTH OF FM 1013 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6010REMOVING CONC (RIPRAP)CY 20.0001 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 223.0002 134 6001BACKFILL (TY A)STA 499.4903 162 6002BLOCK SODDINGSY 207.0004 164 6009BROADCAST SEED (TEMP) (WARM)SY 22,200.0005 164 6011BROADCAST SEED (TEMP) (COOL)SY 22,200.0006 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 44,399.0007 168 6001VEGETATIVE WATERINGMG 373.0008 169 6006SOIL RETENTION BLANKETS (CL 2) (TY F)SY 10.0009 247 6133FL BS (RDWY DEL) (TY D GR 1-2)TON 32,227.00010 310 6012PRIME COAT (RC-250)GAL 46,621.00011 316 6485AGGR (TY-D GR-5 OR TY-L GR-5)CY 1,794.00012 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 15,476.00013 400 6006CUT & RESTORING PAVSY 1.00014 401 6001FLOWABLE BACKFILLCY 6.00015 432 6045RIPRAP (MOW STRIP)(4 IN)CY 76.00016 451 6019RETROFIT RAIL (TY T631)LF 100.00017 464 6003RC PIPE (CL III)(18 IN)LF 44.00018 464 6005RC PIPE (CL III)(24 IN)LF 20.00019 467 6356SET (TY II) (18 IN) (RCP) (3: 1) (C)EA 1.00020 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 2.00021 467 6362SET (TY II) (18 IN) (RCP) (6: 1) (C)EA 1.00022 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 2.00023 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 6.00024 496 6006REMOV STR (HEADWALL)EA 8.00025 500 6001MOBILIZATIONLS 1.00026 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00027 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 100.00028 506 6011ROCK FILTER DAMS (REMOVE)LF 100.00029 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,000.00030 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,000.00031 530 6011INTRSCT, DRVWAYS, & TURNOUT (ACP)SY 919.00032 533 6001RUMBLE STRIPS (SHOULDER)LF 99,898.00033 533 6002RUMBLE STRIPS (CENTERLINE)LF 49,949.00034 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,362.00035 540 6020MTL W - BEAM GD FEN (LOW FILL CULVERT)LF 188.00036 542 6001REMOVE METAL BEAM GUARD FENCELF 1,100.00037 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00038 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 8.00039 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 18.00040 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 4,902.00041 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 100,592.00042 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 10,020.00043 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 38,053.00044 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 283.00045 672 6009REFL PAV MRKR TY II-A-AEA 976.00046 130526001EMULSIONGAL 536,116.00047 30526005CEMENTTON 1,026.00048 130526006EMUL TRTMNT (MX EXST MTRL & NEW BASE)9"SY 233,094.00049 30766024D-GR HMA TY-C SAC-A PG70-22TON 25,643.00050 30766066TACK COATGAL 23,314.00051 61856002TMA (STATIONARY)DAY 180.00052 61856005TMA (MOBILE OPERATION)DAY 15.00053 1A30636001ASPHALT BINDER (PG64-22)GAL 303,002.00054 1A30636009FOAMED ASPHALT TREATMENT(9")(DC)SY 233,094.00055 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00