COUNTY: FORT BEND HIGHWAY: FM 359 LENGTH: 4.6040MI CONTROL NUMBER: 0543-02-076 DBE GOAL: 0.0 % PROJECT NUMBER: F 2022(199) TYPE: OVERLAY TIME FOR COMPLETION: 45 WORKING DAYSGUARANTY: 29,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 01, 2021*EST.COST: 1,459,117.33 BIDS WILL BE OPENED: 1:00 PM DECEMBER 01, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCARLOS ZEPEDA JR ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4235 SH 36 200 E RIVERSIDEROSENBERG, TX 77471 AUSTIN TX 78704-1204979/864-8523 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: WALLER COUNTY LINE LIMITS TO: NORTH OF FM 1093 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6004BACKFILL (TY A OR B)STA 237.6601 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 5,000.0002 354 6041PLANE ASPH CONC PAV (1.5")SY 110,491.0003 500 6001MOBILIZATIONLS 1.0004 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0005 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 40,164.0006 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 19,780.0007 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 14.0008 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 2.0009 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 1.00010 636 6007REPLACE EXISTING ALUMINUM SIGNS(TY A)SF 16.00011 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 41.00012 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 10.00013 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 1.00014 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 9.00015 644 6076REMOVE SM RD SN SUP&AMEA 57.00016 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 26.00017 658 6081INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)EA 27.00018 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 48,172.00019 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 48,172.00020 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 2,064.00021 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 510.00022 662 6017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA 8.00023 662 6029WK ZN PAV MRK NON-REMOV(W)(WORD)EA 8.00024 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 4,680.00025 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 14,906.00026 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 4,680.00027 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 14,906.00028 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 1,032.00029 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 255.00030 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 4.00031 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 4.00032 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 48,172.00033 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 4,680.00034 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 14,906.00035 672 6007REFL PAV MRKR TY I-CEA 53.00036 672 6009REFL PAV MRKR TY II-A-AEA 647.00037 30766041D-GR HMA TY-D SAC-A PG70-22TON 9,206.46038 30766066TACK COATGAL 12,363.00039 61856002TMA (STATIONARY)DAY 14.00040 61856005TMA (MOBILE OPERATION)DAY 110.00041 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $15,600.00