COUNTY: FORT BEND HIGHWAY: FM 1875 LENGTH: 4.5940MI CONTROL NUMBER: 0527-05-012 SBE GOAL: 0.0 % PROJECT NUMBER: C 527-5-12 TYPE: OVERLAY TIME FOR COMPLETION: 45 WORKING DAYSGUARANTY: 39,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 06, 2024*EST.COST: 1,950,822.73 BIDS WILL BE OPENED: 1:00 PM MARCH 06, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCARLOS ZEPEDA JR ATTN: CONSTRUCTION DIVISION - M1C3.02 4235 SH 36 6230 E. STASSNEY LANEROSENBERG, TX 77471 AUSTIN TX 78744-3147979/864-8523 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: UA 90 LIMITS TO: SL 540 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 110 6001EXCAVATION (ROADWAY)CY 39.0001 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 117.0002 134 6004BACKFILL (TY A OR B)STA 243.0003 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 516.0004 432 6045RIPRAP (MOW STRIP)(4 IN)CY 15.0005 500 6001MOBILIZATIONLS 1.0006 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.0007 514 6013PERM CTB (F-SHAPE) (TY 1)LF 200.0008 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 45,220.0009 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 24,275.00010 540 6001MTL W-BEAM GD FEN (TIM POST)LF 300.00011 540 6005TERMINAL ANCHOR SECTIONEA 4.00012 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00013 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00014 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 14.00015 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 5.00016 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 12.00017 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 24.00018 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 12.00019 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.00020 644 6031IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)EA 2.00021 644 6076REMOVE SM RD SN SUP&AMEA 39.00022 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 4.00023 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 10.00024 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 8.00025 658 6081INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)EA 47.00026 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 48,100.00027 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 59.00028 662 6023WK ZN PAV MRK NON-REMOV (W)(RR XING)EA 1.00029 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 4,836.00030 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 10,629.00031 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 59.00032 666 6093REFL PAV MRK TY I (W)(RR XING)(100MIL)EA 1.00033 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 48,100.00034 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 4,836.00035 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 10,629.00036 672 6009REFL PAV MRKR TY II-A-AEA 319.00037 677 6002ELIM EXT PAV MRK & MRKS (6")LF 63,565.00038 677 6007ELIM EXT PAV MRK & MRKS (24")LF 59.00039 677 6016ELIM EXT PAV MRK & MRKS (RR XING)EA 1.00040 678 6002PAV SURF PREP FOR MRK (6")LF 127,130.00041 678 6008PAV SURF PREP FOR MRK (24")LF 118.00042 678 6020PAV SURF PREP FOR MRK (RR XING)EA 2.00043 30766041D-GR HMA TY-D SAC-A PG70-22TON 7,212.00044 30766066TACK COATGAL 7,868.00045 61856002TMA (STATIONARY)DAY 10.00046 61856005TMA (MOBILE OPERATION)DAY 108.00047 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $23,000.00