COUNTY: SMITH HIGHWAY: IH 20 LENGTH: 2.9850MI CONTROL NUMBER: 0495-04-070 DBE GOAL: 0.0 % PROJECT NUMBER: NH 2020(707) TYPE: OVERLAY TIME FOR COMPLETION: 66 WORKING DAYSGUARANTY: 49,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 09, 2020*EST.COST: 2,457,558.56 BIDS WILL BE OPENED: 1:00 PM APRIL 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPAUL SCHNEIDER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 15986 SH 155 SOUTH 200 E RIVERSIDETYLER, TX 75703 AUSTIN TX 78704-1204903/509-9066 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.2 MI E OF FM 849, E LIMITS TO: 0.842 MI W OF US 69 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 121.0001 134 6001BACKFILL (TY A)STA 200.1202 316 6406ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)GAL 7,224.0003 316 6407AGGR (TY-PD GR-3 OR TY-PL GR-3)CY 172.0004 348 6001TBPFC (MEMBRANE)GAL 33,155.0005 348 6002TBPFC (ASPHALT)(PG 76-22)TON 459.0006 348 6012 TBPFC (AGGREGATE) (SAC-A)TON 7,192.0007 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 6,222.0008 354 6045PLANE ASPH CONC PAV (2")SY 10,495.0009 354 6051PLANE ASPH CONC PAV (0" TO 1 1/2")SY 15,536.00010 432 6045RIPRAP (MOW STRIP)(4 IN)CY 70.00011 500 6001MOBILIZATIONLS 1.00012 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00013 533 6001RUMBLE STRIPS (SHOULDER)LF 45,708.00014 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,300.00015 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00016 542 6001REMOVE METAL BEAM GUARD FENCELF 790.00017 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 2.00018 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00019 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 2.00020 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 52.00021 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 868.00022 662 6112WK ZN PAV MRK SHT TERM RMV (W)(4")LF 3,141.00023 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 8,690.00024 666 6039REFL PAV MRK TY I (W)12"(LNDP)(100MIL)LF 700.00025 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 2,140.00026 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 150.00027 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 6,980.00028 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 27,130.00029 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 150.00030 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 27,130.00031 672 6010REFL PAV MRKR TY II-C-REA 1,007.00032 30026001MEMBRANE UNDERSEALGAL 2,100.00033 30776033SP MIXES SP-C SAC-A PG76-22TON 1,115.00034 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 130.00035 61856002TMA (STATIONARY)DAY 46.00036 61856005TMA (MOBILE OPERATION)DAY 12.00037 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $23,000.00