COUNTY: MILLS, ETCHIGHWAY: FM 45 LENGTH: 7.4020MI CONTROL NUMBER: 0480-07-014, ETCDBE GOAL: 0.0 % PROJECT NUMBER: BR 2B24(034), ETC TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 510 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2024 EST.COST: 27,675,597.35 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS GRAF, P.E. ATTN: CONSTRUCTION DIVISION - RM M1C3.02 2495 HWY 183 N 6230 E. STASSNEY LANEBROWNWOOD, TX 76802 AUSTIN TX 78744-3147325/643-0441 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ MILLS0480-07-014.410 MI N OF COLORADO RIVER BRIDGE FM 45BR 2B24(034)S. ABUTMENT COLORADO RIVER BRIDGE LENGTH: 0.6230 MILES SAN SABA0480-08-024MILLS C/L FM 45F 2B24(036)RICHLAND CREEK LENGTH: 0 MILES SAN SABA0480-08-028AT COLORADO RIVER RELIEF BRIDGE FM 45BR 2B24(035). LENGTH: 0.9260 MILES SAN SABA0480-08-0331.061 MI. S OF FM 574 FM 45STP 2B24(033)HES.414 MI N OF FM 502 LENGTH: 5.8530 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 621.0001 104 6021REMOVING CONC (CURB)LF 150.0002 105 6077REMOVING STAB BASE & ASPH PAV (8")SY 10,174.0003 110 6001EXCAVATION (ROADWAY)CY 245,073.0004 110 6002EXCAVATION (CHANNEL)CY 799.0005 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 126,895.0006 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 5,254.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 105,875.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 105,875.0009 168 6001VEGETATIVE WATERINGMG 5,509.00010 216 6001PROOF ROLLINGHR 5.00011 247 6053FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)CY 88,674.00012 276 6080CM TRT(PT MX)(CL M)(TY A)(GR 4)(FN POS)CY 119.50013 310 6009PRIME COAT (MC-30)GAL 61,449.00014 310 6012PRIME COAT (RC-250)GAL 2,403.00015 316 6016ASPH (AC-20XP)GAL 77,143.00016 316 6017ASPH (AC-20-5TR)GAL 9,171.00017 316 6022ASPH (CRS-2)GAL 77,143.00018 316 6048ASPH (AC-20-5TR)TON 117.00019 316 6175AGGR(TY-B GR-4 SAC-B)CY 93.00020 316 6222AGGR(TY-PB GR-3 SAC-B)CY 4,130.00021 316 6224AGGR(TY-PB GR-4 SAC-B)CY 2,667.00022 334 6104HMCL ACP TY-F AC-1.5TON 118.60023 400 6005CEM STABIL BKFLCY 541.00024 401 6001FLOWABLE BACKFILLCY 549.00025 402 6001TRENCH EXCAVATION PROTECTIONLF 486.00026 416 6001DRILL SHAFT (18 IN)LF 342.00027 416 6004DRILL SHAFT (36 IN)LF 2,068.00028 416 6005DRILL SHAFT (42 IN)LF 117.00029 416 6007DRILL SHAFT (54 IN)LF 400.00030 420 6011CL B CONC (FLUME)CY 136.00031 420 6013CL C CONC (ABUT)CY 72.20032 420 6014CL C CONC (ABUT)(HPC)CY 66.30033 420 6029CL C CONC (CAP)CY 20.00034 420 6030CL C CONC (CAP)(HPC)CY 177.10035 420 6037CL C CONC (COLUMN)CY 8.40036 420 6038CL C CONC (COLUMN)(HPC)CY 310.60037 420 6051CL C CONC (CULV)CY 276.40038 420 6166CL C CONC (TIE BEAM)CY 36.00039 422 6001REINF CONC SLABSF 9,660.00040 422 6002REINF CONC SLAB (HPC)SF 40,480.00041 422 6015APPROACH SLABCY 70.60042 422 6016APPROACH SLAB (HPC)CY 70.60043 425 6038PRESTR CONC GIRDER (TX46)LF 4,775.00044 425 6039PRESTR CONC GIRDER (TX54)LF 906.50045 432 6002RIPRAP (CONC)(5 IN)CY 412.60046 432 6008RIPRAP (CONC)(CL B)(RR8&RR9)CY 144.00047 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 93.00048 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 330.00049 432 6036RIPRAP (STONE PROTECTION)(30 IN)CY 3,340.00050 432 6045RIPRAP (MOW STRIP)(4 IN)CY 189.00051 450 6023RAIL (TY SSTR)LF 484.00052 450 6024RAIL (TY SSTR)(HPC)LF 1,824.00053 454 6018SEALED EXPANSION JOINT (4 IN) (SEJ - M)LF 272.00054 460 6009CMP AR (GAL STL DES 2)LF 198.00055 462 6001CONC BOX CULV (3 FT X 2 FT)LF 448.10056 462 6002CONC BOX CULV (3 FT X 3 FT)LF 117.30057 462 6004CONC BOX CULV (4 FT X 3 FT)LF 153.35058 462 6005CONC BOX CULV (4 FT X 4 FT)LF 112.20059 462 6045CONC BOX CULV (3 FT X 2 FT)(EXTEND)LF 112.20060 462 6046CONC BOX CULV (3 FT X 3 FT)(EXTEND)LF 25.00061 462 6047CONC BOX CULV (4 FT X 2 FT)(EXTEND)LF 24.40062 467 6105SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)EA 1.00063 467 6106SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)EA 5.00064 467 6111SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)EA 2.00065 467 6112SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)EA 9.00066 467 6117SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C)EA 4.00067 467 6139SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)EA 2.00068 467 6146SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)EA 1.00069 467 6148SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)EA 1.00070 467 6150SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)EA 1.00071 467 6154SET (TY I)(S= 4 FT)(HW= 6 FT)(3:1) (C)EA 2.00072 467 6190SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)EA 3.00073 467 6191SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)EA 1.00074 467 6524SET (TY II) (DES 2) (CMP) (6: 1) (C)EA 50.00075 496 6001REMOV STR (BOX CULVERT)EA 3.00076 496 6004REMOV STR (SET)EA 1.00077 496 6006REMOV STR (HEADWALL)EA 1.00078 496 6007REMOV STR (PIPE)LF 292.00079 496 6008REMOV STR (BOX CULVERT)LF 26.90080 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00081 496 6011REMOV STR (BRIDGE 500 - 999 FT LENGTH)EA 1.00082 496 6016REMOV STR (PIPE)EA 7.00083 496 6043REMOV STR (SMALL FENCE)LF 262.00084 496 6087REMOV STR (DRAINAGE FLUME)EA 1.00085 500 6001MOBILIZATIONLS 1.00086 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 20.00087 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 700.00088 506 6011ROCK FILTER DAMS (REMOVE)LF 700.00089 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 225.00090 506 6024CONSTRUCTION EXITS (REMOVE)SY 225.00091 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 590.00092 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 590.00093 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 1,140.00094 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,140.00095 508 6001CONSTRUCTING DETOURSSY 84,191.00096 510 6004ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)DAY 70.00097 512 6001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF 1,740.00098 512 6013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 540.00099 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 1,500.000100 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 1,740.000101 512 6076PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)LF 540.000102 529 6014CONC CURB (MOD) (TYPE I)LF 348.000103 530 6002INTERSECTIONS (ACP)SY 891.000104 530 6006DRIVEWAYS (SURF TREAT)SY 4,056.000105 533 6001RUMBLE STRIPS (SHOULDER)LF 66,786.000106 533 6002RUMBLE STRIPS (CENTERLINE)LF 37,057.000107 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 1,950.000108 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 2.000109 540 6020MTL W - BEAM GD FEN (LOW FILL CULVERT)LF 125.000110 540 6033MTL BM GD FEN (LONG SPAN SYSTEM)EA 4.000111 542 6001REMOVE METAL BEAM GUARD FENCELF 3,600.000112 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 10.000113 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 16.000114 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 2.000115 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.000116 545 6004CRASH CUSH ATTEN (STKPL)EA 4.000117 545 6005CRASH CUSH ATTEN (REMOVE)EA 8.000118 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 4.000119 552 6001WIRE FENCE (TY A)LF 870.000120 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 9.000121 636 6001ALUMINUM SIGNS (TY A)SF 59.000122 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 19.000123 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 11.000124 644 6005IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)EA 5.000125 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 5.000126 644 6017IN SM RD SN SUP&AM TY10BWG(2)SA(P)EA 1.000127 644 6056IN SM RD SN SUP&AM TYTWT(1)UA(P)EA 8.000128 644 6057IN SM RD SN SUP&AM TYTWT(1)UA(T)EA 4.000129 644 6059IN SM RD SN SUP&AM TYTWT(1)UB(T)EA 1.000130 644 6076REMOVE SM RD SN SUP&AMEA 36.000131 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 36.000132 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 57.000133 658 6073INSTL OM ASSM (OM-2Y)(WC)GND(BI)EA 48.000134 658 6081INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)EA 12.000135 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 134,129.000136 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 125,444.000137 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 1,731.000138 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 7,500.000139 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 7,764.000140 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 10,426.000141 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 1,450.000142 666 6030REFL PAV MRK TY I (W)8"(DOT)(100MIL)LF 300.000143 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 2,727.000144 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 16.000145 666 6072REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)EA 2.000146 666 6141REFL PAV MRK TY I (Y)12"(SLD)(100MIL)LF 270.000147 666 6174REFL PAV MRK TY II (W) 6" (SLD)LF 54,298.000148 666 6208REFL PAV MRK TY II (Y) 6" (BRK)LF 3,829.000149 666 6210REFL PAV MRK TY II (Y) 6" (SLD)LF 34,417.000150 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 6,452.000151 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 6,490.000152 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 69,686.000153 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 7,318.000154 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 77,014.000155 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 9.000156 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 9.000157 672 6007REFL PAV MRKR TY I-CEA 232.000158 672 6009REFL PAV MRKR TY II-A-AEA 2,777.000159 677 6001ELIM EXT PAV MRK & MRKS (4")LF 85,103.000160 677 6038ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS)EA 49.000161 682 6003VEH SIG SEC (12")LED(YEL)EA 4.000162 685 6004INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)EA 2.000163 30766002D-GR HMA TY-B SAC-B PG64-22TON 7,073.000164 30776064SP MIXES SP-D PG76-22TON 15,843.000165 30846001BONDING COURSEGAL 31,685.000166 Total Bid Amount _______________________________ ____________________________________ certifies that the unit prices shown on this completed computer print-out for all of the bid items, alternate items, option items, and add alternate items contained in this proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other information from this print-out. ____________________________________ acknowledges and agrees that the total bid amount shown will be read as its total bid and further agree that the official total bid amount will be determined by multiplying the unit bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then totaling all of the extended amounts. Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________ Additional Signature for Joint Venture: Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________