COUNTY: LAVACA HIGHWAY: UA 90 LENGTH: 0.8110MI CONTROL NUMBER: 0446-01-050 DBE GOAL: 7.0 % PROJECT NUMBER: BR 2024(508) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 349 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 05, 2024*EST.COST: 11,635,484.10 BIDS WILL BE OPENED: 1:00 PM MARCH 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOE MORROW IV ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK ST 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147361/293-4399 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT NAVIDAD RIVER LIMITS TO: STR # 0446-01-007 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 16.0001 110 6001EXCAVATION (ROADWAY)CY 14,096.0002 110 6002EXCAVATION (CHANNEL)CY 2,160.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 14,607.0004 150 6002BLADINGHR 50.0005 160 6005FURNISHING AND PLACING TOPSOILCY 634.0006 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 25,346.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 6,337.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 6,337.0009 168 6001VEGETATIVE WATERINGMG 215.00010 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 3,840.00011 247 6057FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)CY 2,620.70012 260 6012LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)TON 96.60013 260 6027LIME TRT (EXST MATL)(8")SY 6,086.00014 275 6001CEMENTTON 58.70015 275 6011CEMENT TREAT(EXIST MATL)(8")SY 6,086.00016 310 6009PRIME COAT (MC-30)GAL 2,294.00017 316 6246AGGR(TY-PE GR-3 SAC-B)CY 135.60018 316 6249AGGR(TY-PE GR-4 SAC-B)CY 33.80019 316 6400ASPH (AC-15P OR AC-10-2TR OR CRS-2P)GAL 6,070.00020 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 100.00021 400 6005CEM STABIL BKFLCY 182.00022 403 6001TEMPORARY SPL SHORINGSF 4,350.00023 416 6004DRILL SHAFT (36 IN)LF 655.00024 416 6005DRILL SHAFT (42 IN)LF 3,872.00025 420 6013CL C CONC (ABUT)CY 67.80026 420 6029CL C CONC (CAP)CY 224.40027 420 6037CL C CONC (COLUMN)CY 183.30028 422 6001REINF CONC SLABSF 62,560.00029 425 6039PRESTR CONC GIRDER (TX54)LF 8,124.00030 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 890.00031 450 6054RAIL (TY SSTR) (W/DRAIN SLOTS)LF 2,768.00032 454 6019SEALED EXPANSION JOINT (5 IN) (SEJ - M)LF 180.00033 1464 6003RC PIPE (CL III)(18 IN)LF 67.00034 2467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 4.00035 496 6012REMOV STR (BRIDGE 1000 FT OR GREATER)EA 1.00036 496 6043REMOV STR (SMALL FENCE)LF 1,236.00037 500 6001MOBILIZATIONLS 1.00038 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 20.00039 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 50.00040 506 6011ROCK FILTER DAMS (REMOVE)LF 50.00041 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 3,697.00042 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 3,697.00043 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 2,460.00044 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 960.00045 512 6053PORT CTB (REMOVE)(F-SHAPE)(TY 1)LF 2,460.00046 530 6006DRIVEWAYS (SURF TREAT)SY 310.00047 533 6001RUMBLE STRIPS (SHOULDER)LF 6,966.00048 533 6002RUMBLE STRIPS (CENTERLINE)LF 3,483.00049 540 6001MTL W-BEAM GD FEN (TIM POST)LF 450.00050 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00051 542 6001REMOVE METAL BEAM GUARD FENCELF 1,650.00052 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00053 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00054 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00055 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.00056 545 6005CRASH CUSH ATTEN (REMOVE)EA 4.00057 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 4.00058 552 6001WIRE FENCE (TY A)LF 1,258.00059 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 1.00060 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 3.00061 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 2.00062 644 6076REMOVE SM RD SN SUP&AMEA 5.00063 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 210.00064 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 8.00065 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 30.00066 662 6067WK ZN PAV MRK REMOV (W)6"(SLD)LF 16,224.00067 662 6098WK ZN PAV MRK REMOV (Y)6"(SLD)LF 19,372.00068 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 730.00069 672 6009REFL PAV MRKR TY II-A-AEA 54.00070 677 6028ELIM EXT PV MRK & MRKS (RUMBLE STRIP)LF 9,000.00071 30766006D-GR HMA TY-B PG70-22TON 1,866.90072 30766042D-GR HMA TY-D SAC-B PG70-22TON 1,231.50073 30766043D-GR HMA TY-D PG70-22 (LEVEL-UP)TON 1,886.80074 30766066TACK COATGAL 2,666.00075 51166001AMPHIBIAN/REPTILE EXCLUSION FENCE INSTLF 8,719.00076 51166002AMPHIBIAN/REPTILE EXCLUSION FENCE REMLF 8,719.00077 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00078 61586001TMSP RADAR SPEED CONTROL MONITOREA 2.00079 61856002TMA (STATIONARY)DAY 20.00080 61856005TMA (MOBILE OPERATION)DAY 20.00081 64396008HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MILLF 8,566.00082 64396014HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MILLF 1,080.00083 64396018PAVEMENT SEALER 6"LF 3,060.00084 1A41226023THERMO PIPE(18")(PP)(TY S)(TY II)LF 67.00085 2A467 6351SET (TY II) (18 IN) (HDPE) (6: 1) (P)EA 4.00086 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $1,500.00