COUNTY: HOPKINS HIGHWAY: SL 301, ETCLENGTH: 0.2800MI CONTROL NUMBER: 0400-03-015, ETCDBE GOAL: 4.0 % PROJECT NUMBER: BR 2022(802), ETC TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 250 WORKING DAYSGUARANTY: 28,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 03, 2022 EST.COST: 1,394,680.00 BIDS WILL BE OPENED: 1:00 PM AUGUST 03, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJESSE HERRERA ATTN: CONSTRUCTION DIVISION - M1C3.02 1100 HILLCREST DRIVE ON S 6230 E. STASSNEY LANESULPHUR SPRINGS, TX 75482 AUSTIN TX 78744-3147903/885-4031 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HOPKINS0400-03-015SL 301 (PIPELINE RD) SL 301BR 2022(802)AT TOWN BRANCH LENGTH: 0.1070 MILES HOPKINS0901-28-092CR 4767 CRBR 2022(132)AT NORTH CANEY CREEK TRIBUTARY LENGTH: 0.0740 MILES HOPKINS0901-28-095CR 3545 CRBR 2022(169)AT MITCHELL CREEK TRIBUTARY LENGTH: 0.03 MILES HOPKINS0901-28-104CR 1180 CRBR 2021(925)AT BIRCH CREEK LENGTH: 0.0690 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 14.8101 110 6001EXCAVATION (ROADWAY)CY 127.0002 110 6002EXCAVATION (CHANNEL)CY 479.0003 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 1,203.0004 164 6009BROADCAST SEED (TEMP) (WARM)SY 2,119.0005 164 6011BROADCAST SEED (TEMP) (COOL)SY 2,119.0006 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 4,239.0007 168 6001VEGETATIVE WATERINGMG 52.2008 247 6064FL BS (CMP IN PLC)(TY A GR 4) (6")SY 2,274.0009 400 6005CEM STABIL BKFLCY 124.00010 416 6002DRILL SHAFT (24 IN)LF 351.00011 416 6004DRILL SHAFT (36 IN)LF 192.00012 420 6013CL C CONC (ABUT)CY 76.80013 420 6029CL C CONC (CAP)CY 7.70014 420 6037CL C CONC (COLUMN)CY 3.50015 422 6001REINF CONC SLABSF 1,690.00016 422 6007REINF CONC SLAB (SLAB BEAM)SF 2,990.00017 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 567.12018 425 6035PRESTR CONC GIRDER (TX28)LF 258.00019 432 6001RIPRAP (CONC)(4 IN)CY 8.00020 432 6002RIPRAP (CONC)(5 IN)CY 32.00021 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 15.00022 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 663.00023 432 6045RIPRAP (MOW STRIP)(4 IN)CY 28.00024 450 6019RAIL (TY T631LS)LF 444.00025 462 6006CONC BOX CULV (5 FT X 2 FT)LF 57.00026 467 6171SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)EA 4.00027 472 6004REMOV & RE - LAY PIPE (18 IN)LF 12.00028 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 4.00029 496 6016REMOV STR (PIPE)EA 1.00030 500 6001MOBILIZATIONLS 1.00031 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 16.00032 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 268.00033 506 6011ROCK FILTER DAMS (REMOVE)LF 268.00034 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 156.00035 506 6024CONSTRUCTION EXITS (REMOVE)SY 156.00036 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,412.00037 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,412.00038 508 6001CONSTRUCTING DETOURSSY 1,276.00039 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 750.00040 542 6001REMOVE METAL BEAM GUARD FENCELF 450.00041 542 6006MTL BM GD FEN (REMOVE & REINSTALL)LF 200.00042 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00043 544 6002GUARDRAIL END TREATMENT (MOVE & RESET)EA 8.00044 550 6006GATE (REMOVE)EA 1.00045 552 6003WIRE FENCE (TY C)LF 447.00046 644 6076REMOVE SM RD SN SUP&AMEA 8.00047 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 4.00048 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 12.00049 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 18.00050 30766067D-GR HMA TY-C SAC-A PG64-22(EXEMPT)TON 108.00051