COUNTY: HARRIS HIGHWAY: SH 146 LENGTH: 4.6630MI CONTROL NUMBER: 0389-13-065, ETCDBE GOAL: 0.0 % PROJECT NUMBER: F 2025(145), ETC TYPE: TRAFFIC CONTROL DEVICES TIME FOR COMPLETION: 68 WORKING DAYSGUARANTY: 13,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 02, 2024 EST.COST: 641,196.78 BIDS WILL BE OPENED: 1:00 PM OCTOBER 02, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJAMAL ELAHI, P.E. ATTN: CONSTRUCTION DIVISION - M1C3.02 702 FM 1959 6230 E. STASSNEY LANEHOUSTON, TX 77034 AUSTIN TX 78744-3147281/464-5501 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HARRIS0389-13-065BS 146-E SH 146F 2025(145)SS 330 LENGTH: 3.6810 MILES HARRIS0389-03-039CHAMBERS C/L SH 146C 389-3-39BS 146-E LENGTH: 0.9820 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 500 7001MOBILIZATIONLS 1.0001 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0002 503 7001PORTABLE CHANGEABLE MESSAGE SIGNDAY 120.0003 505 7001TMA (STATIONARY)DAY 120.0004 505 7002TMA (MOBILE OPERATION)HR 60.0005 666 7236RE PM TY III (W)(6")(SLD)LF 39,290.0006 666 7237RE PM TY III (W)(6")(BRK)LF 21,940.0007 666 7239RE PM TY III (W)(8")(SLD)LF 11,064.0008 666 7242RE PM TY III (W)(12")(SLD)LF 2,069.0009 666 7243RE PM TY III (W)(12")(DOT)LF 567.00010 666 7244RE PM TY III (W)(24")(SLD)LF 172.00011 666 7248RE PM TY III (Y)(6")(SLD)LF 40,072.00012 666 7249RE PM TY III (Y)(6")(BRK)LF 1,400.00013 666 7252RE PM TY III (Y)(12")(SLD)LF 225.00014 666 7253RE PM TY III (Y)(24")(SLD)LF 1,394.00015 666 7262RE PM TY III (BLK)(6")(SHADOW)LF 21,900.00016 666 7347PAVEMENT SLER 6"LF 124,602.00017 666 7348PAVEMENT SLER 8"LF 11,064.00018 666 7350PAVEMENT SLER 12"LF 2,861.00019 666 7352PAVEMENT SLER 24"LF 1,593.00020 666 7353PAVEMENT SLER (ARROW)EA 29.00021 666 7354PAVEMENT SLER (WORD)EA 23.00022 666 7356PAVEMENT SLER (DBL ARROW)EA 1.00023 666 7358PAVEMENT SLER (UTURN ARROW)EA 4.00024 666 7390PAVEMENT SLER (SYMBOL)(CALLOUT)EA 6.00025 668 7091PREFAB PM TY C (W)(ARROW)EA 29.00026 668 7093PREFAB PM TY C (W)(DBL ARROW)EA 1.00027 668 7096PREFAB PM TY C (W)(UTURN ARROW)EA 4.00028 668 7103PREFAB PM TY C (W)(WORD)EA 23.00029 668 7135PREFAB PM TY C (MULTI)(SHIELD)EA 6.00030 672 7002REFL PAV MRKR TY I-CEA 24.00031 672 7004REFL PAV MRKR TY II-A-AEA 245.00032 672 7006REFL PAV MRKR TY II-C-REA 1,731.00033 677 7002ELIM EXT PM & MRKS (6")LF 128,570.00034 677 7004ELIM EXT PM & MRKS (8")LF 11,064.00035 677 7006ELIM EXT PM & MRKS (12")LF 2,861.00036 677 7008ELIM EXT PM & MRKS (24")LF 1,593.00037 677 7009ELIM EXT PM & MRKS (ARROW)EA 24.00038 677 7010ELIM EXT PM & MRKS (DBL ARROW)EA 1.00039 677 7012ELIM EXT PM & MRKS (UTURN ARROW)EA 4.00040 677 7015ELIM EXT PM & MRKS (WORD)EA 17.00041 677 7022ELIM EXT PM & MRKS (SHIELD)EA 8.00042 678 7002PAV SURF PREP FOR MRK (6")LF 124,602.00043 678 7004PAV SURF PREP FOR MRK (8")LF 11,064.00044 678 7006PAV SURF PREP FOR MRK (12")LF 2,861.00045 678 7008PAV SURF PREP FOR MRK (24")LF 1,593.00046 678 7009PAV SURF PREP FOR MRK (ARROW)EA 29.00047 678 7010PAV SURF PREP FOR MRK (DBL ARROW)EA 1.00048 678 7012PAV SURF PREP FOR MRK (UTURN ARR)EA 4.00049 678 7016PAV SURF PREP FOR MRK (WORD)EA 23.00050 678 7025PAV SURF PREP FOR MRK (SHIELD)EA 6.00051