COUNTY: GALVESTON HIGHWAY: SH 87, ETCLENGTH: 20.4850MI CONTROL NUMBER: 0367-03-037, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 367-3-37, ETC TYPE: BASE REP, MILL & O/L TIME FOR COMPLETION: 90 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 06, 2019 EST.COST: 7,058,422.12 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 06, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMUHAMMAD ELAHI ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 5407 GULF FREEWAY 200 E RIVERSIDELA MARQUE, TX 77568 AUSTIN TX 78704-1204409/978-2500 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ GALVESTON0367-03-037CRYSTAL BEACH SH 87C 367-3-37GILCHRIST LENGTH: 7.9670 MILES GALVESTON0367-04-080FERRY LANDING SH 87C 367-4-80CRYSTAL BEACH LENGTH: 11.6450 MILES GALVESTON0367-09-004SH 87 SH 168C 367-9-4END OF STATE MAINTENANCE LENGTH: 0.8730 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6002BACKFILL (TY B)STA 1,036.0001 134 6004BACKFILL (TY A OR B)STA 46.5002 305 6019SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")SY 19,688.0003 316 6009ASPH (A-R TYPE II OR III)GAL 294,682.0004 316 6224AGGR(TY-PB GR-4 SAC-B)CY 5,364.0005 340 6135D-GR HMA(SQ) TY-D SAC-A PG76-22TON 1,766.0006 341 6041D-GR HMA TY-D SAC-A PG70-22TON 42,475.0007 351 6010FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")SY 250.0008 351 6015FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")SY 1,000.0009 432 6002RIPRAP (CONC)(5 IN)CY 24.00010 500 6001MOBILIZATIONLS 1.00011 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 15.00012 540 6001MTL W-BEAM GD FEN (TIM POST)LF 300.00013 542 6001REMOVE METAL BEAM GUARD FENCELF 300.00014 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00015 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 2.00016 636 6007REPLACE EXISTING ALUMINUM SIGNS(TY A)SF 1,139.00017 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 29.00018 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 219,942.00019 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 4,635.00020 662 6014WK ZN PAV MRK NON-REMOV (W)12"(SLD)LF 414.00021 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 1,203.00022 662 6017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA 29.00023 662 6029WK ZN PAV MRK NON-REMOV(W)(WORD)EA 71.00024 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 12,310.00025 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 111,494.00026 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 4,635.00027 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 414.00028 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 1,155.00029 666 6054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA 29.00030 666 6078REFL PAV MRK TY I (W)(WORD)(100MIL)EA 71.00031 666 6343REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)LF 210,810.00032 666 6346REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)LF 11,307.00033 666 6347REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)LF 110,198.00034 672 6009REFL PAV MRKR TY II-A-AEA 6,017.00035 672 6010REFL PAV MRKR TY II-C-REA 232.00036 688 6004VEH LP DETECT (SAWCUT)LF 153.00037 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 180.00038 61856002TMA (STATIONARY)DAY 29.00039 61856003TMA (MOBILE OPERATION)HR 174.00040