COUNTY: LAVACA HIGHWAY: SH 111 LENGTH: 1.1070MI CONTROL NUMBER: 0346-06-050 DBE GOAL: 7.0 % PROJECT NUMBER: BR 2024(575) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 311 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 04, 2024*EST.COST: 11,370,551.00 BIDS WILL BE OPENED: 1:00 PM APRIL 04, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOE MORROW IV ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK ST 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147361/293-4399 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT LAVACA RIVER & LAVACA RIVER RELIEF LIMITS TO: STR # 0346-06-024 & -025 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 19.0001 110 6001EXCAVATION (ROADWAY)CY 16,231.0002 110 6002EXCAVATION (CHANNEL)CY 4,810.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 35,006.0004 150 6002BLADINGHR 90.0005 160 6005FURNISHING AND PLACING TOPSOILCY 2,108.8006 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 56,663.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 14,166.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 14,166.0009 168 6001VEGETATIVE WATERINGMG 480.00010 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 1,400.00011 247 6057FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)CY 4,873.00012 260 6012LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)TON 179.20013 260 6027LIME TRT (EXST MATL)(8")SY 11,315.00014 275 6001CEMENTTON 108.20015 275 6011CEMENT TREAT(EXIST MATL)(8")SY 11,315.00016 310 6009PRIME COAT (MC-30)GAL 4,254.00017 316 6246AGGR(TY-PE GR-3 SAC-B)CY 250.90018 316 6249AGGR(TY-PE GR-4 SAC-B)CY 32.00019 316 6542ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)GAL 9,909.00020 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 100.00021 400 6005CEM STABIL BKFLCY 339.00022 401 6001FLOWABLE BACKFILLCY 12.00023 403 6001TEMPORARY SPL SHORINGSF 2,440.00024 416 6004DRILL SHAFT (36 IN)LF 1,770.00025 416 6005DRILL SHAFT (42 IN)LF 2,840.00026 420 6010CL A CONC (PLUG)EA 2.00027 420 6013CL C CONC (ABUT)CY 135.60028 420 6029CL C CONC (CAP)CY 122.40029 420 6037CL C CONC (COLUMN)CY 114.50030 422 6001REINF CONC SLABSF 38,594.00031 425 6039PRESTR CONC GIRDER (TX54)LF 5,010.00032 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 3,320.00033 450 6054RAIL (TY SSTR) (W/DRAIN SLOTS)LF 1,774.00034 454 6018SEALED EXPANSION JOINT (4 IN) (SEJ - M)LF 270.00035 464 6003RC PIPE (CL III)(18 IN)LF 142.00036 465 6167INLET (COMPL)(TY AD)EA 2.00037 479 6006ADJUSTING INLET (CAP)EA 2.00038 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00039 496 6011REMOV STR (BRIDGE 500 - 999 FT LENGTH)EA 1.00040 500 6001MOBILIZATIONLS 1.00041 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 18.00042 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 280.00043 506 6011ROCK FILTER DAMS (REMOVE)LF 280.00044 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 4,731.00045 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 4,731.00046 512 6005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 1,740.00047 512 6029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 600.00048 512 6053PORT CTB (REMOVE)(F-SHAPE)(TY 1)LF 1,740.00049 530 6006DRIVEWAYS (SURF TREAT)SY 835.00050 533 6001RUMBLE STRIPS (SHOULDER)LF 12,820.00051 533 6002RUMBLE STRIPS (CENTERLINE)LF 6,410.00052 540 6001MTL W-BEAM GD FEN (TIM POST)LF 900.00053 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00054 542 6001REMOVE METAL BEAM GUARD FENCELF 2,000.00055 542 6005RM MTL BM GD FEN TRANS (T101)EA 8.00056 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00057 544 6002GUARDRAIL END TREATMENT (MOVE & RESET)EA 4.00058 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 8.00059 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 4.00060 545 6005CRASH CUSH ATTEN (REMOVE)EA 8.00061 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 8.00062 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 2.00063 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 2.00064 644 6076REMOVE SM RD SN SUP&AMEA 4.00065 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 142.00066 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 8.00067 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 60.00068 662 6067WK ZN PAV MRK REMOV (W)6"(SLD)LF 22,964.00069 662 6098WK ZN PAV MRK REMOV (Y)6"(SLD)LF 24,518.00070 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,400.00071 672 6009REFL PAV MRKR TY II-A-AEA 80.00072 677 6028ELIM EXT PV MRK & MRKS (RUMBLE STRIP)LF 11,300.00073 30766006D-GR HMA TY-B PG70-22TON 3,465.70074 30766042D-GR HMA TY-D SAC-B PG70-22TON 1,964.30075 30766043D-GR HMA TY-D PG70-22 (LEVEL-UP)TON 2,501.50076 30766066TACK COATGAL 4,576.00077 51166001AMPHIBIAN/REPTILE EXCLUSION FENCE INSTLF 12,405.00078 51166002AMPHIBIAN/REPTILE EXCLUSION FENCE REMLF 12,405.00079 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00080 61586001TMSP RADAR SPEED CONTROL MONITOREA 2.00081 61856002TMA (STATIONARY)DAY 20.00082 61856005TMA (MOBILE OPERATION)DAY 20.00083 64396008HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MILLF 12,820.00084 64396014HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MILLF 1,610.00085 64396018PAVEMENT SEALER 6"LF 1,890.00086 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $1,500.00