COUNTY: JACKSON HIGHWAY: SH 111 LENGTH: 3MI CONTROL NUMBER: 0346-02-016 DBE GOAL: 0.0 % PROJECT NUMBER: STP 1902(023)HES TYPE: SFT TIME FOR COMPLETION: 45 WORKING DAYSGUARANTY: 24,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2019*EST.COST: 1,213,740.50 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMIKE BRZOZOWSKI ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 11401 US 59 N 200 E RIVERSIDEVICTORIA, TX 77905 AUSTIN TX 78704-1204361/573-9251 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 3.0 MI W OF MATAGORDA C/L LIMITS TO: MATAGORDA C/L ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6002BACKFILL (TY B)STA 158.4001 150 6002BLADINGHR 20.0002 247 6057FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)CY 160.0003 316 6249AGGR(TY-PE GR-4 SAC-B)CY 554.0004 316 6400ASPH (AC-15P OR AC-10-2TR OR CRS-2P)GAL 24,443.0005 341 6039D-GR HMA TY-D SAC-B PG64-22TON 845.0006 341 6042D-GR HMA TY-D SAC-B PG70-22TON 6,040.0007 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 1,000.0008 354 6022PLANE ASPH CONC PAV(0" TO 3")SY 30,819.0009 438 6001CLEANING AND SEALING EXISTING JOINTSLF 336.00010 451 6019RETROFIT RAIL (TY T631)LF 418.00011 500 6001MOBILIZATIONLS 1.00012 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.00013 533 6001RUMBLE STRIPS (SHOULDER)LF 31,680.00014 533 6002RUMBLE STRIPS (CENTERLINE)LF 15,840.00015 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,407.00016 542 6001REMOVE METAL BEAM GUARD FENCELF 1,400.00017 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00018 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 8.00019 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00020 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 44.00021 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 31,680.00022 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 3,960.00023 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 792.00024 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 31,680.00025 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 3,960.00026 672 6009REFL PAV MRKR TY II-A-AEA 198.00027 61856001TMA (STATIONARY)EA 2.00028 61856005TMA (MOBILE OPERATION)DAY 20.00029 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00