COUNTY: LAVACA HIGHWAY: US 77 LENGTH: 1MI CONTROL NUMBER: 0269-02-068 DBE GOAL: 3.0 % PROJECT NUMBER: F 2022(703) TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 105 WORKING DAYSGUARANTY: 42,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 04, 2022*EST.COST: 2,098,278.80 BIDS WILL BE OPENED: 1:00 PM AUGUST 04, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCLAYTON HARRIS ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK STREET 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147979/533-0478 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.13 MI NORTH OF FM 532 W LIMITS TO: 0.30 MI SOUTH OF FM 532 E ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6011REMOVING CONC (MEDIANS)SY 4.0001 112 6001SUBGRADE WIDENING (ORD COMP)STA 45.3602 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 8,510.0003 150 6002BLADINGHR 20.0004 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 22,942.0005 164 6009BROADCAST SEED (TEMP) (WARM)SY 5,760.0006 164 6011BROADCAST SEED (TEMP) (COOL)SY 5,760.0007 168 6001VEGETATIVE WATERINGMG 193.1008 247 6057FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)CY 2,923.0009 247 6117FL BS (RDWY DEL) (TY E GR 1-2) (IN VEH)CY 1,999.00010 260 6012LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)TON 303.00011 260 6027LIME TRT (EXST MATL)(8")SY 9,520.00012 275 6001CEMENTTON 337.00013 275 6004CEMENT TREAT (MX EXST MTL & NW BS) (6")SY 18,533.00014 275 6010CEMENT TREAT (SUBGRADE) (8")SY 9,520.00015 305 6030SALV, HAUL & STKPL RCL ASH PV (12")SY 331.00016 310 6009PRIME COAT (MC-30)GAL 3,508.00017 316 6249AGGR(TY-PE GR-4 SAC-B)CY 327.00018 316 6400ASPH (AC-15P OR AC-10-2TR OR CRS-2P)GAL 15,503.00019 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 300.00020 354 6020PLANE ASPH CONC PAV(0" TO 1")SY 1,636.00021 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 50.00022 432 6006RIPRAP (CONC)(CL B)CY 1.75023 462 6045CONC BOX CULV (3 FT X 2 FT)(EXTEND)LF 15.00024 464 6003RC PIPE (CL III)(18 IN)LF 20.00025 467 6106SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)EA 2.00026 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 2.00027 496 6042REMOV STR (SMALL)EA 1.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00030 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 300.00031 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 300.00032 530 6002INTERSECTIONS (ACP)SY 230.00033 530 6006DRIVEWAYS (SURF TREAT)SY 117.00034 533 6001RUMBLE STRIPS (SHOULDER)LF 12,436.00035 533 6002RUMBLE STRIPS (CENTERLINE)LF 8,913.00036 536 6004CONC DIRECTIONAL ISLANDSY 4.00037 610 6288IN RD IL (TY SA) 50T-10 (400W EQ) LEDEA 5.00038 618 6023CONDT (PVC) (SCH 40) (2")LF 509.00039 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 231.00040 620 6007ELEC CONDR (NO.8) BARELF 740.00041 620 6008ELEC CONDR (NO.8) INSULATEDLF 1,480.00042 624 6010GROUND BOX TY D (162922)W/APRONEA 6.00043 628 6145ELC SRV TY D 120/240 060(NS)SS(E)SP(O)EA 2.00044 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 4.00045 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 3.00046 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 4.00047 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 16.00048 644 6076REMOVE SM RD SN SUP&AMEA 27.00049 658 6073INSTL OM ASSM (OM-2Y)(WC)GND(BI)EA 4.00050 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 525.00051 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 15,726.00052 662 6060WK ZN PAV MRK REMOV (W)4"(BRK)LF 180.00053 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 17,288.00054 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 23,676.00055 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 188.00056 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,059.00057 666 6006REFL PAV MRK TY I (W)4"(DOT)(100MIL)LF 938.00058 666 6030REFL PAV MRK TY I (W)8"(DOT)(100MIL)LF 1,303.00059 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 1,303.00060 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 40.00061 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 3.00062 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 3.00063 668 6106PREFAB PAV MRK TY C (Y) (12") (SLD)LF 522.00064 672 6007REFL PAV MRKR TY I-CEA 135.00065 672 6009REFL PAV MRKR TY II-A-AEA 617.00066 30766002D-GR HMA TY-B SAC-B PG64-22TON 185.00067 30766004D-GR HMA TY-B PG64-22 (LEVEL-UP)TON 500.00068 30766042D-GR HMA TY-D SAC-B PG70-22TON 6,661.00069 30766043D-GR HMA TY-D PG70-22 (LEVEL-UP)TON 492.00070 30766066TACK COATGAL 4,801.00071 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00072 61586001TMSP RADAR SPEED CONTROL MONITOREA 2.00073 61856002TMA (STATIONARY)DAY 10.00074 61856005TMA (MOBILE OPERATION)DAY 20.00075 64396004HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MILLF 12,326.00076 64396010HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MILLF 525.00077 64396012HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MILLF 15,726.00078 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $1,500.00