COUNTY: FAYETTE HIGHWAY: FM 1295 LENGTH: 0.1460MI CONTROL NUMBER: 0267-04-015 SBE GOAL: 0.0 % PROJECT NUMBER: C 267-4-15 TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 32,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 01, 2024*EST.COST: 1,603,565.85 BIDS WILL BE OPENED: 1:00 PM OCTOBER 01, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOE MORROW IV ATTN: CONSTRUCTION DIVISION - M1C3.02 403 HUCK ST 6230 E. STASSNEY LANEYOAKUM, TX 77995 AUSTIN TX 78744-3147361/293-4399 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT MULBERRY CREEK LIMITS TO: STR#0267-04-018 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 7002PREPARING ROWSTA 3.0001 110 7001EXCAV (ROADWAY)CY 2,017.0002 132 7005EMBANK (FNL)(OC)(TY C)CY 950.0003 150 7002BLADINGHR 20.0004 164 7002BROADCAST SEED (PERM_RURAL_CLAY)SY 4,908.0005 164 7005BROADCAST SEED (TEMP_WARM)SY 1,227.0006 164 7006BROADCAST SEED (TEMP_COOL)SY 1,227.0007 168 7001VEGETATIVE WATERINGTGL 41.3708 275 7001CEMENTTON 34.0009 275 7003CEMENT TRT (EXIST MATL)(8")SY 2,787.00010 316 7232AGGR (TY-PE, GR-4)(SAC-B)CY 19.00011 316 7264ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)GAL 860.00012 341 7001D-GR HMA TY-B PG64-22TON 1,170.00013 341 7050D-GR HMA TY-D SAC-B PG70-22TON 271.00014 341 7082TACK COATGAL 266.00015 400 7010CEM STABIL BKFLCY 60.00016 416 7005DRILL SHAFT (30 IN)LF 464.00017 420 7012CL C CONC (ABUT)CY 34.20018 420 7022CL C CONC (CAP)CY 23.80019 420 7038CL C CONC (COLUMN)CY 5.80020 422 7005REINF CONC SLAB (BOX BEAM)SF 6,495.00021 422 7020SHEAR KEYCY 30.50022 425 7026PRESTR CONC BOX BEAM (4B20)LF 714.03023 425 7027PRESTR CONC BOX BEAM (5B20)LF 714.03024 432 7043RIPRAP (STONE PROTECTION)(18 IN)CY 240.00025 450 7008RAIL (TY T223)LF 392.00026 454 7003ARMOR JOINT (SEALED)LF 65.00027 464 7003RC PIPE (CL III)(18 IN)LF 230.00028 467 7308SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 2.00029 496 7009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00030 500 7001MOBILIZATIONLS 1.00031 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00032 503 7002PORTABLE CHANGEABLE MESSAGE SIGNEA 3.00033 505 7001TMA (STATIONARY)DAY 4.00034 505 7003TMA (MOBILE OPERATION)DAY 4.00035 506 7001ROCK FILTER DAMS (INSTALL) (TY 1)LF 40.00036 506 7011ROCK FILTER DAMS (REMOVE)LF 40.00037 506 7039TEMP SEDMT CONT FENCE (INSTALL)LF 1,420.00038 506 7041TEMP SEDMT CONT FENCE (REMOVE)LF 1,420.00039 530 7010DRIVEWAYS (ACP)SY 40.00040 540 7001MTL W-BEAM GD FEN (TIM POST)LF 300.00041 540 7005MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 3.00042 544 7001GUARDRAIL END TREATMENT (INSTALL)EA 3.00043 545 7006CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 1.00044 552 7001WIRE FENCE (TY A)LF 700.00045 552 7010WIRE FENCE (WATER GAP)LF 75.00046 644 7057IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 1.00047 644 7073REMOVE SM RD SN SUP&AMEA 3.00048 658 7013INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)EA 8.00049 658 7019INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 12.00050 666 7269RE PROFILE PM TY I(Y)6"(SLD)(090MIL)LF 696.00051 666 7273RE PROFILE PM TY I(Y)6"(BRK)(090MIL)LF 194.00052 666 7410REFL PAV MRK TY I (W)6"(SLD)(090MIL)LF 1,550.00053 672 7004REFL PAV MRKR TY II-A-AEA 19.00054 ROAD USER COST 800 7001NO. OF WORKING DAYS$/D 3,008.00055 ** THE NO. OF WORKING DAYS OF 110.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST. * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $1,500.00