COUNTY: NOLAN HIGHWAY: SH 70 LENGTH: 0MI CONTROL NUMBER: 0264-02-029, ETCDBE GOAL: 3.0 % PROJECT NUMBER: F 2024(927) TYPE: OVERLAY TIME FOR COMPLETION: 106 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 05, 2024 EST.COST: 5,667,844.93 BIDS WILL BE OPENED: 1:00 PM MARCH 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRYAN SAYLES ATTN: CONSTRUCTION DIVISION - M1C3.02 1301 N HWY 350 6230 E. STASSNEY LANEBIG SPRING, TX 79720 AUSTIN TX 78744-3147432/263-4768 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ NOLAN0264-02-029SH 153 SH 70F 2024(927)1.099MI SOUTH OF CO RD 236 LENGTH: 0 MILES NOLAN0264-03-0191.099MI SOUTH OF CO RD 236 SH 70F 2024(927)COKE CO LINE LENGTH: 0 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6001BACKFILL (TY A)STA 797.1001 351 6013FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")SY 3,398.0002 354 6089PLANE ASPH CONC PAV(1" TO 2")SY 6,660.0003 500 6001MOBILIZATIONLS 1.0004 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.0005 533 6001RUMBLE STRIPS (SHOULDER)LF 109,229.0006 533 6002RUMBLE STRIPS (CENTERLINE)LF 68,440.0007 540 6001MTL W-BEAM GD FEN (TIM POST)LF 5,950.0008 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.0009 542 6001REMOVE METAL BEAM GUARD FENCELF 5,025.00010 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 21.00011 542 6005RM MTL BM GD FEN TRANS (T101)EA 8.00012 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 38.00013 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 7.00014 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 104.00015 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 1,491.00016 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 5,666.00017 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 3,892.00018 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 2,445.00019 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 157,662.00020 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 8,741.00021 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 99,913.00022 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 100.00023 668 6083PREFAB PAV MRK TY C (W) (LNDP ARROW)EA 20.00024 668 6084PREFAB PAV MRK TY C (W) (NUMBER)EA 1.00025 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 1.00026 672 6007REFL PAV MRKR TY I-CEA 122.00027 672 6009REFL PAV MRKR TY II-A-AEA 1,716.00028 30816008TOM-C PG76-22 SAC-BTON 18,431.00029 30816015TACK COATGAL 33,571.00030 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 80.00031 61856002TMA (STATIONARY)DAY 101.00032 61856005TMA (MOBILE OPERATION)DAY 20.00033