COUNTY: UPSHUR HIGHWAY: US 271 LENGTH: 4.1690MI CONTROL NUMBER: 0248-05-065 SBE GOAL: 0.0 % PROJECT NUMBER: C 248-5-65 TYPE: OVERLAY TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 05, 2024*EST.COST: 6,469,790.40 BIDS WILL BE OPENED: 1:00 PM APRIL 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWENDY STARKES ATTN: CONSTRUCTION DIVISION - M1C3.02 300 EAST LOOP 390 N 6230 E. STASSNEY LANEMARSHALL, TX 75670 AUSTIN TX 78744-3147903/935-2809 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.06 MI N OF FM 726 LIMITS TO: GREGG C/L ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 133.0001 104 6054REMOVING CONCRETE(MOW STRIP)LF 350.0002 132 6017EMBANKMENT (VEHICLE)(ORD COMP)(TY A)CY 14.0003 134 6003BACKFILL (TY C)STA 232.2004 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 15,479.0005 164 6071BROADCAST SEED (TEMP)(WARM OR COOL)SY 15,479.0006 168 6001VEGETATIVE WATERINGMG 495.3007 351 6013FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")SY 150.0008 354 6045PLANE ASPH CONC PAV (2")SY 147,207.0009 432 6045RIPRAP (MOW STRIP)(4 IN)CY 32.00010 500 6001MOBILIZATIONLS 1.00011 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00012 533 6001RUMBLE STRIPS (SHOULDER)LF 21,935.00013 540 6001MTL W-BEAM GD FEN (TIM POST)LF 250.00014 542 6001REMOVE METAL BEAM GUARD FENCELF 250.00015 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00016 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 2.00017 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 9.00018 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 9.00019 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 25.00020 644 6076REMOVE SM RD SN SUP&AMEA 46.00021 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 6.00022 662 6005WK ZN PAV MRK NON-REMOV (W)6"(BRK)LF 11,780.00023 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 1,280.00024 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 53,368.00025 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 106.00026 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 10.00027 668 6084PREFAB PAV MRK TY C (W) (NUMBER)EA 6.00028 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 12.00029 672 6007REFL PAV MRKR TY I-CEA 728.00030 672 6009REFL PAV MRKR TY II-A-AEA 1,256.00031 30776032SP MIXES SP-C PG76-22TON 1,855.00032 30776075TACK COATGAL 1,592.00033 30806007STONE-MTRX-ASPH SMA-D SAC-A PG76-22TON 14,512.00034 30806029TACK COATGAL 15,705.00035 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00036 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 4,824.00037 61496004REFL PAV MRK AWT (W) 6" (SLD) (100MIL)LF 43,098.00038 61496005REFL PAV MRK AWT (W) 6" (BRK) (100MIL)LF 11,780.00039 61496010REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)LF 47,008.00040 61496011REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)LF 1,280.00041 61856002TMA (STATIONARY)DAY 50.00042 61856005TMA (MOBILE OPERATION)DAY 10.00043 ROAD USER COST 800 6001NO. OF WORKING DAYS$/D 6,880.00044 ** THE NO. OF WORKING DAYS OF 58.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST. * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $15,000.00