COUNTY: WEBB HIGHWAY: SH 44 LENGTH: 23MI CONTROL NUMBER: 0237-03-035 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2020(668)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 136 WORKING DAYSGUARANTY: 23,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2020*EST.COST: 1,240,764.74 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJESUS SAAVEDRA ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1817 BOB BULLOCK LOOP 200 E RIVERSIDELAREDO, TX 78043 AUSTIN TX 78704-1204956/712-7702 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: LA SALLE COUNTY LINE LIMITS TO: 23 MILES E OF LA SALLE COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6010REMOVING CONC (RIPRAP)CY 39.0001 104 6054REMOVING CONCRETE(MOW STRIP)LF 6,250.0002 132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY 138.0003 400 6005CEM STABIL BKFLCY 84.0004 403 6001TEMPORARY SPL SHORINGSF 2,254.0005 432 6002RIPRAP (CONC)(5 IN)CY 38.0006 467 6019SET (TY I) (42 IN) (4: 1) (C)EA 4.0007 467 6219SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)EA 4.0008 467 6224SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)EA 14.0009 467 6228SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)EA 2.00010 467 6249SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)EA 6.00011 467 6254SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)EA 4.00012 467 6257SET (TY I)(S= 7 FT)(HW= 7 FT)(4:1) (C)EA 2.00013 467 6280SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)EA 1.00014 467 6284SET (TY I)(S= 8 FT)(HW= 7 FT)(4:1) (C)EA 1.00015 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 4.00016 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 4.00017 496 6005REMOV STR (WINGWALL)EA 18.00018 496 6006REMOV STR (HEADWALL)EA 8.00019 500 6001MOBILIZATIONLS 1.00020 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00021 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 364.00022 506 6011ROCK FILTER DAMS (REMOVE)LF 364.00023 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 42.00024 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,678.00025 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,678.00026 510 6001ONE-WAY TRAF CONT (FLAGGER CONT)HR 160.00027 512 6072PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)LF 300.00028 512 6074PTB (MOVE)(SGL SLP)(TY 1) OR (STL)LF 6,300.00029 512 6076PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)LF 300.00030 542 6001REMOVE METAL BEAM GUARD FENCELF 3,650.00031 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 52.00032 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 42.00033 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00034 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 2.00035 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 26.00036 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00037 61856002TMA (STATIONARY)DAY 160.00038 61856003TMA (MOBILE OPERATION)HR 200.00039 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $94,000.00