COUNTY: HOCKLEY, ETCHIGHWAY: US 385 LENGTH: 55.2080MI CONTROL NUMBER: 0227-06-026, ETCDBE GOAL: 1.0 % PROJECT NUMBER: STP 1802(433), ETC TYPE: SUBGRADE WIDEN FLEX BS HOT MIX TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2018 EST.COST: 24,005,485.91 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMICHALE WITTIE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 135 SLATON ROAD 200 E RIVERSIDELUBBOCK, TX 79404 AUSTIN TX 78704-1204806/748-4466 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HOCKLEY0227-06-0261.86 MI S OF FM 300 US 385STP 1802(433)TERRY COUNTY LINE LENGTH: 13.5750 MILES TERRY0227-09-018HOCKLEY COUNTY LINE US 385STP 2018(393)RR CROSSING IN BROWNFIELD LENGTH: 13.9580 MILES HOCKLEY0227-06-030FM 300 US 385STP 2018(940)HESTERRY COUNTY LINE LENGTH: 13.58 MILES HOCKLEY0227-06-029FM 300 US 385STP 1802(472)HESTERRY COUNTY LINE LENGTH: 13.58 MILES HOCKLEY0227-06-028INTERSECTION US 385STP 1802(472)HESAT FM 1585 LENGTH: 0.5150 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 85.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 580.0002 110 6001EXCAVATION (ROADWAY)CY 801.9103 110 6002EXCAVATION (CHANNEL)CY 3,003.0004 112 6003SUBGRADE WIDENING (DENS CONT)SY 103,662.9305 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 1,040.0006 134 6002BACKFILL (TY B)STA 1,360.0907 150 6001BLADINGSTA 1,360.0908 251 6027REWORK BS MTL (TY B) (6") (DENS CONT)SY 4,350.0009 310 6009PRIME COAT (MC-30)GAL 21,316.00010 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 83,052.09011 315 6004FOG SEAL (CSS-1H)GAL 72,194.50012 341 6086D-GR HMA TY-B PG70-28TON 26,106.54013 341 6088D-GR HMA TY-C SAC-B PG70-28TON 46,264.43014 346 6048STONE-MTRX-ASPH SMA-D SAC-A PG70-28TON 73,665.46015 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 32,000.00016 400 6005CEM STABIL BKFLCY 184.94017 432 6001RIPRAP (CONC)(4 IN)CY 23.89018 460 6002CMP (GAL STL 18 IN)LF 21.00019 460 6003CMP (GAL STL 24 IN)LF 531.00020 460 6004CMP (GAL STL 30 IN)LF 120.00021 460 6005CMP (GAL STL 36 IN)LF 117.00022 460 6011CMP AR (GAL STL DES 4)LF 48.00023 464 6005RC PIPE (CL III)(24 IN)LF 80.00024 464 6007RC PIPE (CL III)(30 IN)LF 48.00025 467 6345SET (TY II) (18 IN) (CMP) (4: 1) (C)EA 1.00026 467 6347SET (TY II) (18 IN) (CMP) (6: 1) (C)EA 1.00027 467 6377SET (TY II) (24 IN) (CMP) (4: 1) (C)EA 2.00028 467 6379SET (TY II) (24 IN) (CMP) (6: 1) (C)EA 38.00029 467 6394SET (TY II) (24 IN) (RCP) (6: 1) (C)EA 7.00030 467 6408SET (TY II) (30 IN) (CMP) (4: 1) (C)EA 2.00031 467 6409SET (TY II) (30 IN) (CMP) (6: 1) (C)EA 12.00032 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 6.00033 467 6441SET (TY II) (36 IN) (CMP) (4: 1) (C)EA 6.00034 467 6443SET (TY II) (36 IN) (CMP) (6: 1) (C)EA 3.00035 467 6551SET (TY II) (DES 4) (CMP) (6: 1) (P)EA 4.00036 480 6001CLEAN EXIST CULVERTSEA 26.00037 500 6001MOBILIZATIONLS 1.00038 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 17.00039 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 624.00040 506 6024CONSTRUCTION EXITS (REMOVE)SY 624.00041 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 18,850.00042 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 18,850.00043 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 12,880.00044 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 12,880.00045 530 6002INTERSECTIONS (ACP)SY 4,333.00046 530 6003INTERSECTIONS (SURF TREAT)SY 2,828.00047 530 6004DRIVEWAYS (CONC)SY 1,139.00048 530 6006DRIVEWAYS (SURF TREAT)SY 777.00049 530 6008TURNOUTS (ACP)SY 1,156.90050 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 271,270.00051 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 135,610.00052 542 6001REMOVE METAL BEAM GUARD FENCELF 175.00053 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00054 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 56.00055 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 12.00056 560 6006MAILBOX INSTALL-M (TWG-POST) TY 2EA 3.00057 620 6004ELEC CONDR (NO.12) INSULATEDLF 250.00058 620 6009ELEC CONDR (NO.6) BARELF 160.00059 636 6001ALUMINUM SIGNS (TY A)SF 54.63060 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 116.00061 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 49.00062 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 34.00063 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00064 644 6028IN SM RD SN SUP&AM TYS80(1)SA(P-BM)EA 1.00065 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 3.00066 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 12.00067 644 6036IN SM RD SN SUP&AM TYS80(1)SA(U-BM)EA 17.00068 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 1.00069 644 6076REMOVE SM RD SN SUP&AMEA 164.00070 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 52.00071 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 24,216.00072 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 813,138.00073 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 991,136.00074 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 18,977.00075 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 10,184.00076 666 6006REFL PAV MRK TY I (W)4"(DOT)(100MIL)LF 3,733.00077 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 269,190.00078 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 18,836.00079 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 12,783.00080 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 200,234.00081 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 314.00082 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 20.00083 668 6089PREFAB PAV MRK TY C (W) (RR XING)EA 1.00084 672 6007REFL PAV MRKR TY I-CEA 1,009.00085 672 6009REFL PAV MRKR TY II-A-AEA 2,936.00086 677 6001ELIM EXT PAV MRK & MRKS (4")LF 744,307.00087 677 6007ELIM EXT PAV MRK & MRKS (24")LF 314.00088 677 6016ELIM EXT PAV MRK & MRKS (RR XING)EA 1.00089 678 6008PAV SURF PREP FOR MRK (24")LF 314.00090 678 6009PAV SURF PREP FOR MRK (ARROW)EA 20.00091 678 6020PAV SURF PREP FOR MRK (RR XING)EA 1.00092 682 6004VEH SIG SEC (12")LED(YEL ARW)EA 4.00093 682 6006VEH SIG SEC (12")LED(RED ARW)EA 4.00094 685 6001INSTALL RDSD FLASH BEACON ASSEMBLYEA 4.00095 730 6107FULL - WIDTH MOWINGCYC 4.00096 734 6002LITTER REMOVALCYC 4.00097 752 6008TREE REMOVAL (24" - 30" DIA)EA 11.00098 760 6001DITCH CLEANING AND RESHAPING (FOOT)LF 124,300.00099 30326001REINFORCED FAB FOR ASPH PVMNT OVERLAYSSY 507,396.890100 30326002ASPH FOR REINF FAB (AC-20-5TR)GAL 101,479.370101 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.000102 61856001TMA (STATIONARY)EA 4.000103 61856005 TMA (MOBILE OPERATION)DAY 30.000104 ROAD USER COST 800 6001NO. OF WORKING DAYS$/D 4,000.000105 ** THE NO. OF WORKING DAYS OF 259.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST.