COUNTY: BOWIE HIGHWAY: US 59 LENGTH: 4.0550MI CONTROL NUMBER: 0218-01-096 DBE GOAL: 0.0 % PROJECT NUMBER: NH 2019(201) TYPE: PLANING, ACP & PAV MRKS TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 96,000.00 BIDS RECEIVED UNTIL: 1:00 PM NOVEMBER 07, 2018 EST.COST: 4,788,910.40 BIDS WILL BE OPENED: 1:00 PM NOVEMBER 07, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPAUL WONG ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 520 SOWELL LANE 200 E RIVERSIDETEXARKANA, TX 75501 AUSTIN TX 78704-1204903/838-8574 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.3 MI. S. OF FM 989 LIMITS TO: 0.5 MI. S. OF FM 2148 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 55.5001 104 6054REMOVING CONCRETE(MOW STRIP)LF 2,375.0002 134 6003BACKFILL (TY C)STA 243.0003 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 14,282.0004 168 6001VEGETATIVE WATERINGMG 229.0005 344 6138SUPERPAVE MIXTURES SP-D PG76-22TON 7,442.0006 346 6045STONE-MTRX-ASPH SMA-D PG76-22TON 15,354.0007 351 6013FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")SY 5,691.0008 354 6021PLANE ASPH CONC PAV(0" TO 2")SY 163,169.0009 432 6045RIPRAP (MOW STRIP)(4 IN)CY 147.00010 438 6001CLEANING AND SEALING EXISTING JOINTSLF 528.00011 438 6005CLEANING AND SEALING JOINTSLF 528.00012 451 6019RETROFIT RAIL (TY T631)LF 300.00013 500 6001MOBILIZATIONLS 1.00014 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00015 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 250.00016 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 250.00017 530 6005DRIVEWAYS (ACP)SY 2,699.00018 533 6001RUMBLE STRIPS (SHOULDER)LF 42,842.00019 540 6001MTL W-BEAM GD FEN (TIM POST)LF 2,350.00020 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00021 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 3.00022 542 6001REMOVE METAL BEAM GUARD FENCELF 1,475.00023 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 3.00024 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 5.00025 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 5.00026 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 6.00027 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 6.00028 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 6.00029 644 6076REMOVE SM RD SN SUP&AMEA 4.00030 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 10.00031 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 15.00032 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 5,355.00033 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 42,841.00034 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 42,841.00035 662 6060WK ZN PAV MRK REMOV (W)4"(BRK)LF 2,678.00036 662 6093WK ZN PAV MRK REMOV (Y)4"(BRK)LF 2,678.00037 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 1,366.00038 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 383.00039 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 21.00040 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 17.00041 668 6092PREFAB PAV MRK TY C (W) (36")(YLD TRI)EA 40.00042 668 6108PREFAB PAV MRK TY C (Y) (24") (SLD)LF 1,190.00043 668 6110PREFAB PAV MRK TY C (Y) (MED NOSE)EA 1.00044 672 6007REFL PAV MRKR TY I-CEA 560.00045 672 6009REFL PAV MRKR TY II-A-AEA 1,573.00046 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00047 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 192.00048 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 42,842.00049 61496016REFL PAV MRK AWT (W) (6")(SLD)(125 MIL)LF 43,380.00050 61496017REFL PAV MRK AWT (W) (6")(BRK)(125 MIL)LF 10,721.00051 61496022REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL)LF 50,105.00052 61496023REFL PAV MRK AWT (Y) (6")(BRK)(125 MIL)LF 9,788.00053 61856001TMA (STATIONARY)EA 1.00054 61856003TMA (MOBILE OPERATION)HR 100.00055