COUNTY: HENDERSON HIGHWAY: BS 31-H LENGTH: 0MI CONTROL NUMBER: 0164-01-075 DBE GOAL: 6.0 % PROJECT NUMBER: F 2022(807) TYPE: PEDESTRIAN, SIDEWALKS & CURB RAMPS TIME FOR COMPLETION: 117 WORKING DAYSGUARANTY: 41,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 03, 2022*EST.COST: 2,036,273.90 BIDS WILL BE OPENED: 1:00 PM AUGUST 03, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONERIC FISHER ATTN: CONSTRUCTION DIVISION - M1C3.02 2400 NE LP 7 6230 E. STASSNEY LANEATHENS, TX 75751 AUSTIN TX 78744-3147903/904-6009 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SOUTH CARROLL STREET LIMITS TO: FM 2495 (FLAT CREEK RD) ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 82.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 4,251.0002 104 6029REMOVING CONC (CURB OR CURB & GUTTER)LF 773.0003 104 6036REMOVING CONC (SIDEWALK OR RAMP)SY 139.0004 104 6044REMOVING CONC (FLUME)SY 188.0005 104 6054REMOVING CONCRETE(MOW STRIP)LF 1,154.0006 105 6037REMOVING STAB BASE AND ASPH PAV(0"-16")SY 149.0007 110 6003EXCAVATION (SPECIAL)CY 230.0008 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 570.0009 162 6002BLOCK SODDINGSY 5,740.00010 168 6001VEGETATIVE WATERINGMG 89.50011 310 6009PRIME COAT (MC-30)GAL 147.00012 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 125.00013 420 6007CL A CONC (FLUME)CY 4.00014 422 6013BRIDGE SIDEWALKSF 1,221.00015 432 6003RIPRAP (CONC)(6 IN)CY 7.00016 432 6022RIPRAP (STONE COMMON)(DRY)(6 IN)CY 22.00017 450 6052RAIL (HANDRAIL)(TY F)LF 1,867.00018 451 6031RETROFIT RAIL (TY C221)LF 212.00019 462 6008CONC BOX CULV (5 FT X 4 FT)LF 6.00020 466 6180WINGWALL (PW - 1) (HW=5 FT)EA 2.00021 471 6003GRATE & FRAMEEA 47.00022 500 6001MOBILIZATIONLS 1.00023 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 18.00024 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,980.00025 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,980.00026 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 200.00027 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 200.00028 512 6021PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF 380.00029 512 6022PORT CTB (DES SOURCE)(LOW PROF)(TY 2)LF 40.00030 512 6033PORT CTB (MOVE)(LOW PROF)(TY 1)LF 380.00031 512 6034PORT CTB (MOVE)(LOW PROF)(TY 2)LF 40.00032 512 6045PORT CTB (STKPL)(LOW PROF)(TY 1)LF 380.00033 512 6046PORT CTB (STKPL)(LOW PROF)(TY 2)LF 40.00034 529 6008CONC CURB & GUTTER (TY II)LF 2,716.00035 529 6019CONC CURB (TY F)LF 1,830.00036 530 6017DRIVEWAYS (CONC) (HES)SY 4,813.00037 531 6001CONC SIDEWALKS (4")SY 4,965.00038 531 6004CURB RAMPS (TY 1)EA 1.00039 531 6005CURB RAMPS (TY 2)EA 3.00040 531 6010CURB RAMPS (TY 7)EA 10.00041 531 6032CONC SIDEWALKS (SPECIAL) (TYPE A)SY 39.00042 542 6001REMOVE METAL BEAM GUARD FENCELF 950.00043 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00044 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 7.00045 644 6071RELOCATE SM RD SN SUP&AM TY TWTEA 3.00046 644 6076REMOVE SM RD SN SUP&AMEA 7.00047 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 92.00048 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 1,567.00049 666 6167REFL PAV MRK TY II (W) 4" (BRK)LF 60.00050 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 92.00051 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 1,567.00052 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 60.00053 677 6001ELIM EXT PAV MRK & MRKS (4")LF 60.00054 677 6003ELIM EXT PAV MRK & MRKS (8")LF 92.00055 677 6007ELIM EXT PAV MRK & MRKS (24")LF 957.00056 678 6001PAV SURF PREP FOR MRK (4")LF 60.00057 678 6004PAV SURF PREP FOR MRK (8")LF 92.00058 678 6008PAV SURF PREP FOR MRK (24")LF 1,567.00059 30766068D-GR HMA TY-D SAC-A PG64-22(EXEMPT)TON 55.00060 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 41.00061 61856002TMA (STATIONARY)DAY 117.00062 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $7,000.00