COUNTY: WICHITA HIGHWAY: SS 447 LENGTH: 0MI CONTROL NUMBER: 0156-12-020 DBE GOAL: 0.0 % PROJECT NUMBER: F 2024(665) TYPE: OVERLAY TIME FOR COMPLETION: 100 WORKING DAYSGUARANTY: 44,000.00 BIDS RECEIVED UNTIL: 1:00 PM JANUARY 05, 2024*EST.COST: 2,188,623.44 BIDS WILL BE OPENED: 1:00 PM JANUARY 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCALLAN COLTHARP ATTN: CONSTRUCTION DIVISION - M1C3.02 2844 EAST CENTRAL FREEWAY 6230 E. STASSNEY LANEWICHITA FALLS, TX 76301 AUSTIN TX 78744-3147940/397-2074 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: HOMES AVENUE LIMITS TO: US 82 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6022REMOVING CONC (CURB AND GUTTER)LF 45.0001 134 6002BACKFILL (TY B)STA 25.0002 164 6005BROADCAST SEED (PERM) (URBAN) (SANDY)SY 3,150.0003 168 6001VEGETATIVE WATERINGMG 26.5004 314 6009EMULS ASPH (EROSN CONT)(MULTI)GAL 788.0005 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 2,300.0006 354 6004PLAN & TEXT ASPH CONC PAV(0" TO 4")SY 34,327.0007 361 6002FULL - DEPTH REPAIR CRCP (8")SY 280.0008 432 6045RIPRAP (MOW STRIP)(4 IN)CY 118.0009 438 6004CLEANING AND SEALING EXIST JOINTS(CL7)LF 2,474.00010 500 6001MOBILIZATIONLS 1.00011 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00012 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 2,650.00013 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 2,650.00014 529 6008CONC CURB & GUTTER (TY II)LF 195.00015 530 6002INTERSECTIONS (ACP)SY 1,964.00016 540 6001MTL W-BEAM GD FEN (TIM POST)LF 2,356.00017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 13.00018 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 4.00019 540 6037MTL BM GD FEN TRANS (ANCHOR PLATE)EA 13.00020 542 6001REMOVE METAL BEAM GUARD FENCELF 2,308.00021 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 4.00022 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 5.00023 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 5.00024 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 6.00025 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 60.00026 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 38.00027 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 1,100.00028 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 48.00029 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 2,925.00030 666 6137REFL PAV MRK TY I (Y)8"(SLD)(090MIL)LF 90.00031 666 6167REFL PAV MRK TY II (W) 4" (BRK)LF 3,230.00032 666 6225PAVEMENT SEALER 6"LF 9,348.00033 666 6226PAVEMENT SEALER 8"LF 1,643.00034 666 6230PAVEMENT SEALER 24"LF 198.00035 666 6305RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)LF 4,290.00036 666 6308RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)LF 15,266.00037 666 6320RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)LF 14,820.00038 668 6074PREFAB PAV MRK TY C (W) (12") (SLD)LF 183.00039 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 608.00040 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 4.00041 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 4.00042 668 6091PREFAB PAV MRK TY C (W) (18")(YLD TRI)EA 16.00043 672 6009REFL PAV MRKR TY II-A-AEA 10.00044 672 6010REFL PAV MRKR TY II-C-REA 441.00045 677 6001ELIM EXT PAV MRK & MRKS (4")LF 9,348.00046 677 6003ELIM EXT PAV MRK & MRKS (8")LF 1,643.00047 677 6007ELIM EXT PAV MRK & MRKS (24")LF 198.00048 677 6008ELIM EXT PAV MRK & MRKS (ARROW)EA 2.00049 684 6028TRF SIG CBL (TY A)(14 AWG)(2 CONDR)LF 598.00050 688 6005VEH LP DETECT (SAWCUT)(14 AWG)(BLK)LF 110.00051 30806007STONE-MTRX-ASPH SMA-D SAC-A PG76-22TON 3,682.00052 30846001BONDING COURSEGAL 2,144.00053 61856002TMA (STATIONARY)DAY 100.00054 61856005TMA (MOBILE OPERATION)DAY 11.00055 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $10,000.00