COUNTY: HOCKLEY HIGHWAY: US 385 LENGTH: 0MI CONTROL NUMBER: 0130-07-033, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 130-7-33, ETC TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 136 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MARCH 06, 2024 EST.COST: 13,680,902.18 BIDS WILL BE OPENED: 1:00 PM MARCH 06, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONNEIL WELCH ATTN: CONSTRUCTION DIVISION - M1C3.02 1600 W DELANO 6230 E. STASSNEY LANELITTLEFIELD, TX 79339 AUSTIN TX 78744-3147432/263-4768 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HOCKLEY0130-07-033SH 114 US 385C 130-7-33BS 114B (HOUSTON ST.) LENGTH: MILES HOCKLEY0227-05-023BRAZIL COUNTY ROAD US 385C 227-5-23ELLIS STREET LENGTH: MILES HOCKLEY0227-12-012BS 114B (HOUSTON ST.) US 385C 227-12-12FM 300 LENGTH: MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6011REMOVING CONC (MEDIANS)SY 878.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 2,380.0002 112 6002SUBGRADE WIDENING (DENS CONT)STA 111.1203 134 6002BACKFILL (TY B)STA 115.4504 150 6001BLADINGSTA 115.4505 216 6001PROOF ROLLINGHR 20.0006 251 6096REWORK BS MTL (TY C)(4")(ORD COMP)SY 67,484.5407 310 6009PRIME COAT (MC-30)GAL 18,787.0008 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 17,067.0009 315 6004FOG SEAL (CSS-1H)GAL 9,994.00010 316 6224AGGR(TY-PB GR-4 SAC-B)CY 256.00011 316 6541ASPH (CSS-1H)GAL 20,203.00012 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 4,457.09013 351 6011FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")SY 1,000.00014 351 6012FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")SY 891.42015 354 6020PLANE ASPH CONC PAV(0" TO 1")SY 1,566.00016 354 6025PLANE ASPH CONC PAV(4" TO 6")SY 67,484.54017 354 6045PLANE ASPH CONC PAV (2")SY 67,484.54018 479 6001ADJUSTING MANHOLESEA 14.00019 479 6005ADJUSTING MANHOLES (WATER VALVE BOX)EA 36.00020 500 6001MOBILIZATIONLS 1.00021 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00022 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 111.11023 506 6024CONSTRUCTION EXITS (REMOVE)SY 111.11024 506 6035SANDBAGS FOR EROSION CONTROLEA 530.00025 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 800.00026 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 400.00027 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,500.00028 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 750.00029 530 6002INTERSECTIONS (ACP)SY 3,277.40030 530 6004DRIVEWAYS (CONC)SY 2,380.00031 530 6005DRIVEWAYS (ACP)SY 14,515.00032 530 6008TURNOUTS (ACP)SY 932.00033 536 6002CONC MEDIANSY 878.00034 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 15.00035 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 9.00036 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 26.00037 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 16.00038 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00039 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00040 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 1.00041 644 6037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA 1.00042 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 2.00043 644 6076REMOVE SM RD SN SUP&AMEA 19.00044 662 6005WK ZN PAV MRK NON-REMOV (W)6"(BRK)LF 14,906.00045 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 143,094.00046 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 7,249.00047 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 648.00048 662 6017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA 51.00049 662 6023WK ZN PAV MRK NON-REMOV (W)(RR XING)EA 12.00050 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 20,576.00051 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 270,590.00052 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 2,035.00053 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 6,106.00054 662 6141WK ZN PAV MRK NON-REMOV (W) (LNDP ARW)EA 4.00055 666 6021REFL PAV MRK TY I (W)6"(LNDP)(100MIL)LF 114.00056 666 6030REFL PAV MRK TY I (W)8"(DOT)(100MIL)LF 279.00057 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 2,679.00058 666 6156REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)EA 10.00059 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 6,200.00060 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 27,165.00061 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 9,290.00062 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 49,761.00063 668 6014PREFAB PAV MRK TY B (W)(8")(SLD)LF 274.00064 668 6018PREFAB PAV MRK TY B (W)(24")(SLD)LF 108.00065 668 6019PREFAB PAV MRK TY B (W)(ARROW)EA 2.00066 668 6047PREFAB PAV MRK TY B (Y)(6")(SLD)LF 286.00067 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 2,924.00068 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 34.00069 668 6083PREFAB PAV MRK TY C (W) (LNDP ARROW)EA 2.00070 668 6089PREFAB PAV MRK TY C (W) (RR XING)EA 5.00071 672 6007REFL PAV MRKR TY I-CEA 464.00072 672 6009REFL PAV MRKR TY II-A-AEA 1,583.00073 677 6002ELIM EXT PAV MRK & MRKS (6")LF 237,775.00074 677 6003ELIM EXT PAV MRK & MRKS (8")LF 3,354.00075 677 6007ELIM EXT PAV MRK & MRKS (24")LF 558.00076 677 6008ELIM EXT PAV MRK & MRKS (ARROW)EA 46.00077 677 6016ELIM EXT PAV MRK & MRKS (RR XING)EA 6.00078 678 6002PAV SURF PREP FOR MRK (6")LF 286.00079 678 6004PAV SURF PREP FOR MRK (8")LF 274.00080 678 6008PAV SURF PREP FOR MRK (24")LF 3,032.00081 678 6009PAV SURF PREP FOR MRK (ARROW)EA 36.00082 678 6020PAV SURF PREP FOR MRK (RR XING)EA 5.00083 678 6024PAV SURF PREP FOR MRK (MED NOSE)EA 10.00084 730 6107FULL - WIDTH MOWINGCYC 2.00085 734 6002LITTER REMOVALCYC 5.00086 738 6003CLEANING / SWEEPING (OUTSIDE MAIN LANE)CYC 4.00087 764 6025STORM SEWER CLEANING (ALL SIZES)LF 1,000.00088 30326001REINFORCED FAB FOR ASPH PVMNT OVERLAYSSY 57,310.05089 30326004ASPH FOR REINF FAB (PG76-28)GAL 18,728.00090 30326005REINFORCED FAB FOR ASPH PVMNT (INSTALL)SY 67,484.54091 30766014D-GR HMA TY-B PG76-28TON 28,094.00092 30766066TACK COATGAL 16,861.00093 30806008STONE-MTRX-ASPH SMA-D SAC-A PG76-28TON 7,970.00094 30806029TACK COATGAL 97.00095 30816011TOM-C PG76-28 SAC-ATON 3,297.00096 30816015TACK COATGAL 66.00097 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 480.00098 61856002TMA (STATIONARY)DAY 232.00099 61856005TMA (MOBILE OPERATION)DAY 30.000100 63076003TEMP SPEED MONITOR SYSEA 1.000101