COUNTY: HAMILTON, ETCHIGHWAY: FM 218, ETCLENGTH: 1.1640MI CONTROL NUMBER: 0120-05-025, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 2019(223)HES TYPE: INCREASE SUPERELEVATION TIME FOR COMPLETION: 90 WORKING DAYSGUARANTY: 10,000.00 BIDS RECEIVED UNTIL: 1:00 PM NOVEMBER 07, 2018 EST.COST: 510,928.70 BIDS WILL BE OPENED: 1:00 PM NOVEMBER 07, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSTEPHEN KASBERG ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3502 E MAIN 200 E RIVERSIDEGATESVILLE, TEXAS, TX 76528 AUSTIN TX 78704-1204254/865-7118 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HAMILTON0120-05-0250.201 MI W OF FM 2005 FM 218STP 2019(223)HES0.418 MI W OF FM 2005 LENGTH: 0.1270 MILES HILL1661-02-0190.1 MI W OF HCR 4415 W FM 67STP 2019(223)HES0.1 MI E OF HCR 4415 E LENGTH: 0.2510 MILES MCLENNAN1969-01-0190.414 MI N OF FM 3268 FM 185STP 2019(223)HES0.634 MI N OF FM 3268 LENGTH: 0.22 MILES BELL2136-01-0210.1 MI W OF FM 2268 SPUR FM 2268STP 2019(223)HESSUMBERA ROAD LENGTH: 0.2290 MILES MCLENNAN2868-01-0112.275 MI E OF IH 35 FM 2837STP 2019(223)HES2.435 MI E OF IH 35 LENGTH: 0.16 MILES BELL2870-01-0100.6 MI W OF CEDAR VALLEY ROAD FM 2843STP 2019(223)HES0.1 MI W OF CEDAR VALLEY ROAD LENGTH: 0.1770 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6054REMOVING CONCRETE(MOW STRIP)LF 850.0001 134 6001BACKFILL (TY A)STA 60.0002 162 6002BLOCK SODDINGSY 6,086.0003 168 6001VEGETATIVE WATERINGMG 49.0004 340 6047D-GR HMA(SQ) TY-C SAC-A PG70-22TON 2,897.0005 432 6045RIPRAP (MOW STRIP)(4 IN)CY 42.0006 500 6001MOBILIZATIONLS 1.0007 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.0008 530 6005DRIVEWAYS (ACP)SY 478.0009 533 6002RUMBLE STRIPS (CENTERLINE)LF 4,211.00010 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 562.50011 542 6001REMOVE METAL BEAM GUARD FENCELF 562.50012 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 5.00013 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 5.00014 644 6012IN SM RD SN SUP&AM TY10BWG(1)SB(T)EA 1.00015 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 55.00016 644 6076REMOVE SM RD SN SUP&AMEA 39.00017 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 6.00018 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 7.00019 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 624.00020 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 30.00021 666 6282REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)LF 12,187.00022 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 12,131.00023 672 6009REFL PAV MRKR TY II-A-AEA 156.00024 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 67.00025 61856002TMA (STATIONARY)DAY 37.00026 61856003TMA (MOBILE OPERATION)HR 90.00027