COUNTY: WILSON, ETCHIGHWAY: US 181, ETCLENGTH: 19.5820MI CONTROL NUMBER: 0100-03-086, ETCDBE GOAL: 3.0 % PROJECT NUMBER: STP 2023(386)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 192 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 02, 2022*EST.COST: 5,075,877.91 BIDS WILL BE OPENED: 1:00 PM DECEMBER 02, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTIMOTHY PARKER ATTN: CONSTRUCTION DIVISION - M1C3.02 9320 SE LOOP 410 6230 E. STASSNEY LANESAN ANTONIO, TX 78223 AUSTIN TX 78744-3147210/633-1417 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ WILSON0100-03-0860.4 MI WEST OF CR150 US 181STP 2023(386)HESSTANDISH ST LENGTH: 11.03 MILES BEXAR0143-01-062LAKE MEADOW ST US 87STP 2023(386)HESSTUART RD LENGTH: 5.3650 MILES BEXAR0143-02-029STUART RD US 87STP 2023(386)HESFM 3465 LENGTH: 2.7280 MILES BEXAR2452-03-126FM 78 SL 1604STP 2023(386)HESHANOVER COVE LENGTH: 0.4590 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 783.0001 105 6144RMV TRT & UNTRT BASE & ASPH PV(12"-30")SY 8,904.0002 110 6001EXCAVATION (ROADWAY)CY 525.0003 132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY 2,550.0004 150 6002BLADINGHR 30.0005 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 178,396.0006 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 178,396.0007 168 6001VEGETATIVE WATERINGMG 2,782.6008 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 178,396.0009 432 6066RIPRAP (CL A) (MOW STRIP) (3 IN)CY 2,634.00010 496 6004REMOV STR (SET)EA 14.00011 496 6007REMOV STR (PIPE)LF 669.00012 500 6001MOBILIZATIONLS 1.00013 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00014 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 4,910.00015 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 4,910.00016 543 6001CABLE BARRIER SYSTEM (TL-3)LF 88,022.00017 543 6019CABLE BARRIER TERMINAL SECTION (TL-3)EA 134.00018 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 18.00019 644 6076REMOVE SM RD SN SUP&AMEA 60.00020 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 286.00021 666 6178REFL PAV MRK TY II (W) 8" (SLD)LF 286.00022 666 6210REFL PAV MRK TY II (Y) 6" (SLD)LF 13,517.00023 666 6343REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)LF 200,096.00024 666 6347REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)LF 213,143.00025 672 6010REFL PAV MRKR TY II-C-REA 14.00026 677 6001ELIM EXT PAV MRK & MRKS (4")LF 13,274.00027 677 6003ELIM EXT PAV MRK & MRKS (8")LF 7,306.00028 61856002TMA (STATIONARY)DAY 176.00029 61856005TMA (MOBILE OPERATION)DAY 39.00030 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $10,500.00