COUNTY: KNOX HIGHWAY: SH 6 LENGTH: 0MI CONTROL NUMBER: 0098-05-034 DBE GOAL: 3.0 % PROJECT NUMBER: F 2023(357) TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 143 WORKING DAYSGUARANTY: 94,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 01, 2022*EST.COST: 4,703,779.43 BIDS WILL BE OPENED: 1:00 PM DECEMBER 01, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS REED ATTN: CONSTRUCTION DIVISION - M1C3.02 7599 US 287 6230 E. STASSNEY LANECHILDRESS, TX 79201 AUSTIN TX 78744-3147940/937-7251 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: US 82, SOUTH LIMITS TO: FM 2534 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 120.0001 134 6004BACKFILL (TY A OR B)STA 381.0002 164 6034DRILL SEEDING (PERM) (RURAL) (SANDY)AC 17.4103 168 6001VEGETATIVE WATERINGMG 1,418.0004 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 16,855.0005 351 6019FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")SY 12,267.0006 354 6021PLANE ASPH CONC PAV(0" TO 2")SY 4,511.0007 354 6022PLANE ASPH CONC PAV(0" TO 3")SY 389.0008 420 6136CL C CONC (RAC-R)CY 57.2009 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 217.00010 432 6045RIPRAP (MOW STRIP)(4 IN)CY 68.00011 450 6018RAIL (TY T631)LF 563.00012 480 6001CLEAN EXIST CULVERTSEA 10.00013 500 6001MOBILIZATIONLS 1.00014 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 9.00015 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,000.00016 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 2.00017 512 6013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 600.00018 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 1,725.00019 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 600.00020 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 74,244.00021 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 37,122.00022 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 1,575.00023 542 6001REMOVE METAL BEAM GUARD FENCELF 1,575.00024 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 24.00025 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 24.00026 545 6002CRASH CUSH ATTEN (DES SOURCE)EA 2.00027 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 10.00028 545 6005CRASH CUSH ATTEN (REMOVE)EA 2.00029 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 42.00030 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 4,172.00031 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 3,640.00032 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 72.00033 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 16,200.00034 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 75,872.00035 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 9,110.00036 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 23,036.00037 672 6009REFL PAV MRKR TY II-A-AEA 739.00038 672 6013TRAFFIC BUTTON TY II-A-AEA 810.00039 677 6001ELIM EXT PAV MRK & MRKS (4")LF 3,640.00040 677 6007ELIM EXT PAV MRK & MRKS (24")LF 72.00041 30766045D-GR HMA TY-D SAC-A PG70-28TON 20,855.00042 30766066TACK COATGAL 19,492.00043 61856002TMA (STATIONARY)DAY 55.00044 61856003TMA (MOBILE OPERATION)HR 72.00045 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $98,000.00