COUNTY: FORT BEND HIGHWAY: SL 540, ETCLENGTH: 4.8390MI CONTROL NUMBER: 0089-18-003, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 89-18-3, ETC TYPE: SC & ACP O/L TIME FOR COMPLETION: 97 WORKING DAYSGUARANTY: 34,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 10, 2018*EST.COST: 1,743,083.09 BIDS WILL BE OPENED: 1:00 PM JULY 10, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONGRADY B. MAPES ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4235 SH 36 SOUTH 200 E RIVERSIDEROSENBERG, TX 77474 AUSTIN TX 78704-1204281/238-7900 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ FORT BEND0089-18-003US 59 SW OF BEASLEY SL 540C 89-18-3US 59 NE OF BEASLEY LENGTH: 2.7320 MILES FORT BEND0089-17-004US 59 SW OF KENDLETON SL 541C 89-17-4US 59 NE OF KENDLETON LENGTH: 2.1070 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6004BACKFILL (TY A OR B)STA 255.5101 305 6015SALV, HAUL & STKPL RCL APH PV (1 1/2")SY 127,535.0002 316 6001ASPH (MULTI OPTION)GAL 51,015.0003 316 6404AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)CY 1,277.0004 341 6041D-GR HMA TY-D SAC-A PG70-22TON 10,521.6405 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 4,279.0006 500 6001MOBILIZATIONLS 1.0007 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.0008 533 6001RUMBLE STRIPS (SHOULDER)LF 46,898.0009 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 9.00010 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 3.00011 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 3.00012 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 77.00013 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 14.00014 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00015 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 2.00016 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 25.00017 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 6.00018 644 6034IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)EA 3.00019 644 6076REMOVE SM RD SN SUP&AMEA 128.00020 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 6.00021 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 21.00022 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 12.00023 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 480.00024 662 6002WK ZN PAV MRK NON-REMOV (W)4"(DOT)LF 180.00025 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 96,660.00026 662 6005WK ZN PAV MRK NON-REMOV (W)6"(BRK)LF 240.00027 662 6006WK ZN PAV MRK NON-REMOV (W)6"(DOT)LF 90.00028 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 48,250.00029 662 6012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF 1,050.00030 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 864.00031 662 6017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA 18.00032 662 6029WK ZN PAV MRK NON-REMOV(W)(WORD)EA 12.00033 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 6,820.00034 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 53,116.00035 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 3,410.00036 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 26,794.00037 662 6041WK ZN PAV MRK NON-REMOV (Y)24"(SLD)LF 1,083.00038 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 90.00039 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 350.00040 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 228.00041 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 361.00042 666 6162RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)LF 240.00043 666 6225PAVEMENT SEALER 6"LF 79,024.00044 666 6226PAVEMENT SEALER 8"LF 350.00045 666 6230PAVEMENT SEALER 24"LF 589.00046 666 6231PAVEMENT SEALER (ARROW)EA 6.00047 666 6232PAVEMENT SEALER (WORD)EA 4.00048 666 6306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF 240.00049 666 6309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF 48,250.00050 666 6318RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)LF 3,410.00051 666 6321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF 26,794.00052 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 6.00053 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 4.00054 672 6009REFL PAV MRKR TY II-A-AEA 463.00055 672 6010REFL PAV MRKR TY II-C-REA 100.00056 60386004MULTIPOLYMER PAV MRK (W)(6")(SLD)LF 252.00057 60386017MULTIPOLYMER PAV MRK (Y)(6")(SLD)LF 252.00058 61856002TMA (STATIONARY)DAY 21.00059 61856003TMA (MOBILE OPERATION)HR 580.00060 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $19,000.00