COUNTY: CAMP, ETCHIGHWAY: SH 11 LENGTH: 50.2450MI CONTROL NUMBER: 0083-07-044, ETCDBE GOAL: 5.0 % PROJECT NUMBER: STP 2019(129)HES TYPE: UPGRADE MBGF TIME FOR COMPLETION: 145 WORKING DAYSGUARANTY: 17,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 03, 2018 EST.COST: 849,812.50 BIDS WILL BE OPENED: 1:00 PM OCTOBER 03, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONKIMBERLY GARNER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2210 FERGUSON RD 200 E RIVERSIDEMT. PLEASANT, TX 75456 AUSTIN TX 78704-1204903/572-8511 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ CAMP0083-07-044WOOD C/L SH 11STP 2019(129)HES0.1 MI. W. OF FM 1520 LENGTH: 11.8840 MILES CAMP0083-08-0540.1 MI. W. OF FM 1520 SH 11STP 2019(129)HESTITUS C/L LENGTH: 6.17 MILES TITUS0083-09-033CAMP C/L SH 11STP 2019(129)HESMORRIS C/L LENGTH: 4.2050 MILES MORRIS0083-10-041TITUS C/L SH 11STP 2019(129)HESUS 259 LENGTH: 5.5910 MILES CASS0218-05-0316.5 MI. W. OF SH 8 SH 11STP 2019(129)HESUS 59 LENGTH: 8.0620 MILES CASS0218-06-026FM 2612 SH 11STP 2019(129)HES6.5 MI. W. OF SH 8 LENGTH: 6.8790 MILES MORRIS0222-03-060US 259 SH 11STP 2019(129)HESCASS C/L LENGTH: 4.51 MILES CASS0222-04-061MORRIS C/L SH 11STP 2019(129)HESFM 2612 LENGTH: 2.9440 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6009REMOVING CONC (RIPRAP)SY 2,629.0001 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 200.0002 164 6071BROADCAST SEED (TEMP)(WARM OR COOL)SY 700.0003 432 6045RIPRAP (MOW STRIP)(4 IN)CY 481.0004 451 6004RETROFIT RAIL (TY T131RC)LF 110.0005 451 6019RETROFIT RAIL (TY T631)LF 225.0006 500 6001MOBILIZATIONLS 1.0007 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.0008 540 6001MTL W-BEAM GD FEN (TIM POST)LF 9,100.0009 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 75.00010 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 44.00011 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 14.00012 542 6001REMOVE METAL BEAM GUARD FENCELF 10,275.00013 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 52.00014 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 60.00015 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 26.00016 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 204.00017 672 6007REFL PAV MRKR TY I-CEA 61.00018 61506001INSTALL SOLAR LED GUARDRAIL MARKEREA 2.00019 61856001TMA (STATIONARY)EA 2.00020