COUNTY: MOORE HIGHWAY: US 287 LENGTH: 8.9060MI CONTROL NUMBER: 0066-04-079 DBE GOAL: 5.0 % PROJECT NUMBER: F 2021(699) TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 137 WORKING DAYSGUARANTY: 82,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 02, 2021*EST.COST: 4,081,800.35 BIDS WILL BE OPENED: 1:00 PM JULY 02, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBERNARDO FERREL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 PO BOX 516 200 E RIVERSIDEDUMAS, TX 79029 AUSTIN TX 78704-1204806/934-1122 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SOUTH OF FM 281 LIMITS TO: DUMAS ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6001REMOVING CONC (PAV)SY 3,081.0001 105 6016REMOVING STAB BASE & ASPH PAV(16")SY 1,561.0002 112 6002SUBGRADE WIDENING (DENS CONT)STA 86.8303 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 1,270.3004 150 6002BLADINGHR 8.0005 164 6036DRILL SEEDING (PERM) (RURAL) (CLAY)AC 6.4306 164 6053DRILL SEEDING (TEMP)(WARM OR COOL)AC 6.4307 314 6009EMULS ASPH (EROSN CONT)(MULTI)GAL 3,119.0008 360 6043CONC PVMT (CONT REINF)(FAST TRK)(13")SY 11,146.0009 432 6045RIPRAP (MOW STRIP)(4 IN)CY 2,043.00010 496 6004REMOV STR (SET)EA 8.00011 496 6007REMOV STR (PIPE)LF 284.00012 500 6001MOBILIZATIONLS 1.00013 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00014 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 1,750.00015 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,750.00016 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 5,450.00017 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 11.00018 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 5.00019 542 6001REMOVE METAL BEAM GUARD FENCELF 4,800.00020 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 3.00021 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 11.00022 543 6002CABLE BARRIER SYSTEM (TL-4)LF 39,215.00023 543 6020CABLE BARRIER TERMINAL SECTION (TL-4)EA 44.00024 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 6.00025 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 6.00026 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 95.00027 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00028 644 6028IN SM RD SN SUP&AM TYS80(1)SA(P-BM)EA 28.00029 644 6076REMOVE SM RD SN SUP&AMEA 124.00030 658 6064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA 625.00031 658 6086INSTL DEL ASSM (D-SY)SZ 1(YFLX)GNDEA 83.00032 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 1,100.00033 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 8,715.00034 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 12,747.00035 666 6101REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)EA 228.00036 50626001PATCHING MILLED CONCRETE RUMBLE STRIPSLF 550.00037 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00038 60196007PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTSTLF 23,960.00039 60246006HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)LF 94,278.00040 60246018HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)LF 92,037.00041 60416001REFURBISH RAISED REFLECT PVMT MRKRSEA 1,389.00042 61856002TMA (STATIONARY)DAY 137.00043 61856003TMA (MOBILE OPERATION)HR 100.00044 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $4,000.00