COUNTY: BOWIE, ETCHIGHWAY: SH 8, ETCLENGTH: 10.50MI CONTROL NUMBER: 0061-02-033, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 2B24(043)HES, ETC TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 210 WORKING DAYSGUARANTY: 26,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2024 EST.COST: 1,308,802.40 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRISTINA TROWLER ATTN: CONSTRUCTION DIVISION - RM M1C3.02 701 EAST MAIN ST 6230 E. STASSNEY LANEATLANTA, TX 75551 AUSTIN TX 78744-3147903/799-1480 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ BOWIE0061-02-033AT FM 1840 SH 8STP 2B24(043)HES. LENGTH: 1 MILES CASS0218-03-095AT FM 2327N US 59STP 2B24(044)VRU. LENGTH: 1 MILES CASS0222-04-068SH 11 SH 49STP 2B24(044)VRU0.5 MI E OF SH 11 LENGTH: 0.50 MILES MARION0223-02-0340.5 MI W OF SH 43 SH 49STP 2B24(044)VRU0.5 MI E OF SH 43 LENGTH: 1 MILES CASS0277-03-0300.5 MI N OF FM 2791 SH 77STP 2B24(043)HES0.5 MI S OF FM 2791 LENGTH: 1 MILES CASS0520-03-0360.5 MI N OF SH 49 SH 155STP 2B24(044)VRU0.5 MI S OF SH 49 LENGTH: 1 MILES MARION0520-04-0350.5 MI N OF FM 729 SH 155STP 2B24(044)VRU0.5 MI S OF FM 729 LENGTH: 1 MILES CASS0546-09-044AT FM 251 FM 125STP 2B24(044)VRU. LENGTH: 1 MILES MARION0632-01-0310.5 MI N OF FM 2208 FM 134STP 2B24(043)HES0.5 MI S OF FM 2208 LENGTH: 1 MILES CASS1574-03-0130.5 MI N OF FM 2612 FM 161STP 2B24(044)VRU0.5 MI S OF FM 2612 LENGTH: 1 MILES MARION3041-02-0200.5 MI E OF FM 2208 FM 3001STP 2B24(043)HES0.5 MI W OF FM 2208 LENGTH: 1 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 640.0001 432 6006RIPRAP (CONC)(CL B)CY 32.0002 500 6001MOBILIZATIONLS 1.0003 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.0004 610 6288IN RD IL (TY SA) 50T-10 (400W EQ) LEDEA 64.0005 618 6023CONDT (PVC) (SCH 40) (2")LF 7,865.0006 618 6024CONDT (PVC) (SCH 40) (2") (BORE)LF 4,637.0007 620 6009ELEC CONDR (NO.6) BARELF 13,147.0008 620 6010ELEC CONDR (NO.6) INSULATEDLF 26,918.0009 624 6002GROUND BOX TY A (122311)W/APRONEA 53.00010 628 6004ELC SRV TY A 120/240 060(NS)AL(E)SP(O)EA 11.00011 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 22.00012 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 4.00013 644 6039IN SM RD SN SUP&AM TYS80(1)SB(P)EA 1.00014 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 30.00015 644 6076REMOVE SM RD SN SUP&AMEA 43.00016 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 567.00017 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 20.00018 668 6078PREFAB PAV MRK TY C (W) (DBL ARROW)EA 2.00019 668 6083PREFAB PAV MRK TY C (W) (LNDP ARROW)EA 2.00020 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 26.00021 680 6004REMOVING TRAFFIC SIGNALSEA 7.00022 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 160.00023 61856002TMA (STATIONARY)DAY 198.00024 Total Bid Amount _______________________________ ____________________________________ certifies that the unit prices shown on this completed computer print-out for all of the bid items, alternate items, option items, and add alternate items contained in this proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other information from this print-out. ____________________________________ acknowledges and agrees that the total bid amount shown will be read as its total bid and further agree that the official total bid amount will be determined by multiplying the unit bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then totaling all of the extended amounts. Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________ Additional Signature for Joint Venture: Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________