COUNTY: COLEMAN HIGHWAY: US 84 LENGTH: 10.63MI CONTROL NUMBER: 0054-02-035, ETCDBE GOAL: 0.0 % PROJECT NUMBER: STP 2020(762)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 88 WORKING DAYSGUARANTY: 10,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 09, 2020 EST.COST: 495,756.55 BIDS WILL BE OPENED: 1:00 PM APRIL 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBART FRIS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2160 CR 381 200 E RIVERSIDEBROWNWOOD, TX 76802 AUSTIN TX 78704-1204325/643-0358 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ COLEMAN0054-02-035TAYLOR C/L US 84STP 2020(762)HES.253 MI SE OF FM 702 LENGTH: 0 MILES COLEMAN0054-03-025.253 MI SE OF FM 702 US 84STP 2020(762)HES2.244 MI NW OF US 283 LENGTH: 10.63 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 836.5001 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 3,328.0002 168 6001VEGETATIVE WATERINGMG 74.6703 500 6001MOBILIZATIONLS 1.0004 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.0005 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 200.0006 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 200.0007 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 200.0008 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 200.0009 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 6,750.00010 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 8.00011 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00012 540 6020MTL W - BEAM GD FEN (LOW FILL CULVERT)LF 200.00013 540 6033MTL BM GD FEN (LONG SPAN SYSTEM)EA 2.00014 542 6001REMOVE METAL BEAM GUARD FENCELF 7,983.50015 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 44.00016 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 92.00017 61856002TMA (STATIONARY)DAY 176.00018